NASDAQ / Last 4 quarters

SLNH earnings call analysis

SLNH. AI-assisted transcript summaries focused on management tone, evasions, goalpost moving, catalysts, risks, and data-center exposure.

4 storedNov 25, 2026

Research summary and source transcript

readyNov 25, 2026

SLNH's FY2026 Q3 call is best read as a thesis-quality check, not a transcript recap. The upside case is that AI and compute-heavy infrastructure demand are becoming real drivers of customer activity. The key investor question is whether that activity converts into durable revenue, royalties, margins, and cash flow rather than remaining a strong-sounding demand story.

Framework #1 asks what management may know now that the market may not fully recognize for 6-24 months. For SLNH, the possible information gradient is whether current demand, backlog, customer activity, or AI/data-center engagement is an early signal of durable conversion rather than a one-quarter narrative. The transcript still needs follow-through in future quarters before that can be treated as proven.

The business engine appears to be demand conversion into revenue at acceptable incremental margins; the fallback needs management's KPIs and historical conversion data to grade it more precisely.

  • Management centered the story on AI, compute, or data-center demand, which is the key thesis variable to verify in future quarters.
  • Backlog and demand visibility were important to the quarter's credibility.
  • Profitability and margin durability should be treated as quality-of-revenue checks, not just headline metrics.
  • Customer renewal and new-logo activity are the clearest checks on whether demand is broadening.
  • Management's strongest emphasis appears to be around demand momentum and AI/compute-related opportunity; the useful investor question is whether that enthusiasm is backed by conversion and customer economics.

The tone reads constructive but still needs investor skepticism. Management appears to have enough operating evidence to discuss momentum, but the call only becomes high-quality if the numbers support conversion, margins, cash flow, and customer breadth. Local fallback reason: model analysis failed during on-demand transcript rendering: Earnings call analyzer failed with status 403..

  • No clear dodged analyst question was detected by the local fallback; manual review should still check whether Q&A answers quantified conversion, margins, and guidance.
  • There may be a benchmark or metric-framing issue worth manual review, especially around adjusted metrics, timelines, or changed expectations.

Competitive position looks potentially improving, but not proven. Customer activity and AI/compute exposure suggest the company may be in the right demand pools; the missing proof is market-share data, pricing power, win/loss detail, and retention economics.

  • Key figure to verify: Revenue grew by 80% year-over-year, our sixth straight quarter of sequential growth.
  • Key figure to verify: Excluding the presentation change Mike described, revenue grew 29%.
  • Key figure to verify: We ended the quarter with $109 million in cash.
  • Key figure to verify: At closing, Applied Digital is expected to own 51% and Saluna 49.
  • Key figure to verify: We ended Q3 with $109.3 million in cash available for project development and operations, up 43% from $76.4 million at year-end.
  • The quarter appears to be moving from story to evidence: operating momentum is showing up in revenue, royalties, or backlog rather than only in management narrative.
  • Customer activity looks healthier than a one-quarter spike because the transcript points to both retention/renewal work and new-account activity.
  • AI and data-center exposure look strategically relevant rather than cosmetic, because management ties demand to compute-heavy end markets instead of treating it as a generic buzzword.
  • Profitability is a quality signal here, but the investment value depends on whether margins can hold as mix, hiring, and customer concentration evolve.
  • The main open question is conversion: AI or data-center engagement has to turn into recurring royalties, cash flow, and repeatable design wins before it deserves full credit in valuation.
  • Backlog lowers some demand uncertainty, but investors still need timing, cancellation risk, concentration, and conversion economics before treating it as de-risked revenue.
  • Margin strength is not itself a risk; the risk is whether that margin level is sustainable if revenue mix, investment spend, or pricing changes.
  • There is enough downside language in the transcript to require follow-up on execution, timing, or disclosure quality rather than reading the quarter as fully clean.

The data-center angle appears investable but still needs sizing. The call connects the company to AI or compute-heavy infrastructure demand, which is directionally positive, but the thesis should depend on how much of that activity becomes durable revenue, royalties, and cash conversion rather than on thematic exposure alone.

  • How much of the AI or data-center engagement converts into recurring royalties or repeat revenue within the next four quarters?
  • What portion of backlog is cancellable, delayed, concentrated, or dependent on a small number of customers?
  • Can current margin levels persist as mix, headcount, and product investment change?
  • Did management quantify cash conversion and operating leverage, or only highlight revenue and demand?
  • Are customer wins broad enough to imply share gain rather than a few isolated projects?

FY2026 Q3 earnings call transcript

36,097 chars

NASDAQ:SLNH Q3 2026 Earnings Call Transcript Generated on 11/25/2026 Operator | Conference Call Operator: Hello, everyone. Thank you for joining us. And welcome to the Saluna third quarter 2026 earnings conference call. After today's prepared remarks, we will host a question and answer session. If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. I will now hand the conference over to Mike Tu, Vice President of Finance. Mike, please go ahead.

Mike Tu | Vice President of Finance

Good afternoon, and thank you for joining Saluna's third quarter 2026 earnings call. Our earnings release and the accompanying presentation are available in the investor relations section of salunacomputing.com. And this call is being webcast with the presentation. With me today are John Belizaire, Chief Executive Officer, Ryan Carver, Chief Development Officer, and Michael Picchi, Chief Financial Officer. Before management begins their formal remarks, we would like to remind everyone that some statements we're making today may be considered forward-looking statements under securities laws and involve a number of risks and uncertainties. As a result, we caution you that there are a number of factors, many of which are beyond our control, which could cause actual results in events to differ materially from those described in the forward-looking statements. For more detailed risks, uncertainties and assumptions related to our forward-looking statements, please see the disclosures in our earnings release and public filings made with the Securities and Exchange Commission. We disclaim any obligation or undertaking to update forward-looking statements to reflect circumstances or events that occur after the date the forward-looking statements are made, except as required by law. We will also discuss non-GAAP financial metrics and encourage you to read our disclosures and the reconciliation tables to applicable GAAP measures in our earnings release carefully as you consider these metrics. We refer you to our filings in the Securities and Exchange Commission for detailed disclosures and descriptions of our business. as well as uncertainties and other valuable circumstances including, but not limited to, risks and uncertainties identified under the caption risk factors in our annual report on Form 10-K for the year ended December 31st, 2025 and our other SEC filings. One reminder before we begin. Effective last quarter, we present pass-through electricity costs on a gross basis rather than net. That change increases both reported revenue and reported costs of revenue by the same amount and has no effect on gross profit, operating loss, or net loss. Prior periods are not revised, so year-over-year revenue comparisons include the change. Affected slides are footnoted. With that, I'll turn it over to John.

John Belizaire | Chief Executive Officer

Thanks, Mike. Hello and welcome to Saluna's third quarter results and business update. I want to start by acknowledging the environment. It's been a difficult market and many of you are feeling it. We are too. So we'll keep today focused on what we're doing and where we stand on what matters most, converting our AI campuses into signed leases. The thesis hasn't changed. Power is the primary constraint in the AI era. Saluna secures long-term behind-the-meter access to power at scale, and we build data centers directly on renewable generation sites. Four numbers frame where we stand. Revenue grew by 80% year-over-year, our sixth straight quarter of sequential growth. Excluding the presentation change Mike described, revenue grew 29%. We now have 206 megawatts of capacity under management following the completion of CAUTI 1 in September. We have more than 650 megawatts of planned AI capacity across our two campuses in early construction, CAUTI 2 and Dorothy 3. And our renewable power development pipeline stands at more than 6.3 gigawatts. Let's get into the quarter. On the business side, three things. First, the team. Ryan joined as Chief Development Officer in July, and he has since brought on Neil Robinson as Vice President of Construction and Mikael Stark as Vice President of Planning. We are investing in this team now so that we have construction, engineering, planning, and procurement leadership in-house as we scale the AI business and are prepared to move as our campuses advance. Second, the balance sheet. We prepaid our Generate facilities at Dorothy 1A and Dorothy 2 in August, and after quarter end, we repaid the remaining Generate balance at Briscoe Wind. With Briscoe's debt repaid, we are positioned to redirect power from the Briscoe Wind farm to the Dorothy 3 AI campus now under construction. We ended the quarter with $109 million in cash. Third, power. In September, ERCOT classified 266 megawatts across our Cottey and Dorothy campuses as base load in its Batch Zero process. These classifications preserve each campus's existing interconnection capacity and exempt it from further reliability evaluation and megawatt allocation in the Batch Zero study. A request for an additional 50 megawatts at Dorothy is under study. On the project side, Cottey 1 is complete at 83 megawatts, and Cottey 2 and Dorothy 3 both advanced in construction work after quarter end. Commercially, at Dorothy 3, we signed a subscription agreement with Applied Digital on October 20th to form a joint venture for a planned 50 megawatts, and Chronoscale has signed a non-binding letter of intent to lease that facility. At CAUTI II, we chose not to renew our prospective tenant's exclusivity and began remarketing the site. We have now entered into a new non-binding letter of intent with a different potential tenant. Ryan will take you through both campuses later. A word on the policy environment. Texas will have new leadership in Austin, and policymakers at every level are taking a closer look at data center development. We built our model with their questions in mind. Renewable computing uses clean power, including wind and solar, that already exists and might otherwise be curtailed, rather than adding new strain on the grid. It's designed to protect the communities we're part of while connecting them to the jobs and investment that come with the future of innovation. We've been making that case in person. We hosted public open houses for Dorothy 3 in Briscoe County in October and for Cottey 2 in Willisee County in November. Ryan will share more in our community update ahead. With that, I'll hand it to Ryan to walk through our pipeline and AI development. Ryan?

Ryan Carver | Chief Development Officer

Thanks, John. Good afternoon. I'll now take you through our AI project updates for the quarter. We've dedicated projects in our existing pipeline to AI, and our AI HPC development portfolio now totals approximately 1.7 gigawatts. This chart shows where each project sits from site control and power through design, financing, and construction. Today I'll zoom in on the two projects in development, Cottey 2 and Dorothy 3. Cottey 2 sits across the street from Cottey 1 in Willisee County. It is planned at more than 350 megawatts at full build. In the third quarter, we brought our general contractor on board and advanced the phase one design into construction documents. We ordered long lead equipment. Engineering is underway to expand the Las Mahadras substation by 100 megawatts. and we executed a gas pipeline access agreement. Since quarter end, Civil One Earthworks started in October and we received our sales and use tax exemption. And on November 12th, we hosted a public open house in Raymondville for Willisee County residents. On the tenant, last quarter, we told you that we had signed a letter of intent for CAUTI II. During the quarter, we decided not to renew that tenant's exclusivity. because we did not expect the tenant to meet the credit requirements we set for a lease of this size. We remarketed the site, which generated strong customer interest and demand. We have signed a new letter of intent with a new customer that we expect to meet our credit requirements. We'll update the market when we have a definitive agreement to announce. Now to Dorothy 3, starting with the partnership we announced in October. We signed a definitive agreement with Applied Digital to form a jointly-owned project company for a planned 50-megawatt AI data center, which will be the first phase of Dorothy 3. At closing, Applied Digital is expected to own 51% and Saluna 49. Both partners fund development in line with their ownership, and Saluna also contributes land and power assets. Applied Digital brings AI data center experience. Saluna brings a wind-powered site with power generation we own. Chronoscale has signed a non-binding letter of intent to lease the facility, and lease negotiations are underway. Closing is expected by early December, subject to remaining conditions. Dorothy III is planned at more than 300 megawatts on 397 acres next to our Briscoe wind farm. In the third quarter, we closed on the land in August, launched master planning and long-wind procurement, and completed environmental, water, survey, and fiber studies. Since quarter end, we hosted a public open house in Silverton on October 2nd, and construction work also began in October. We received our sales and use tax exemption, and on November 9th, Briscoe County approved a tax abatement agreement for the project. With the generated debt at Briscoe repaid, we can now direct power from the wind farm to the campus. This slide brings both campuses together. What we've completed in the third quarter, what's done or in motion since, and what comes next. At Cottey 2, the third quarter was about design and procurement. We brought on our general contractor, moved Phase 1 into construction documents, ordered long-lead equipment, started the Las Mojadas substation expansion, and executed a gas pipeline access agreement. Since quarter end, civil and earthworks have started, we received our sales and use tax exemption, and we hosted a public open house in Raymondville on November 12th as part of the property tax abatement process. With assigned LOI, we expect the next milestone announcements to be assigned lease and project financing. At Dorothy III, we closed on the land in the third quarter, launched master planning and long lead procurement, and completed site studies. Since quarter end, we've signed a definitive agreement with Applied Digital for phase one. Construction work started. We received our sales and use tax exemption. Briscoe County approved the property tax abatement on November 9th, and we repaid the generate debt, freeing Briscoe's power for the campus. Closing the Applied Digital joint venture is in progress and expected by year end, subject to remaining conditions. The next milestones are converting the Chrono Scale Letter of Intent into a signed lease and the first RFS tranche delivery. As John mentioned, Both campuses build on power we already hold. Cottey 2 Phase 1 sits within the 166 megawatts of base load at Cottey and Dorothy 3 Phase 1 within the 100 megawatts at Dorothy. The milestones marked targeted don't have committed dates. We'll report on them as they happen. One more topic before I hand off because investors have asked about it and it matters to how we build. Communities and policymakers across Texas are taking a closer look at data center development. Our approach is to engage early and in public. Over the past six weeks, we hosted open houses in both counties with bilingual materials and a dedicated community engagement lead. A few proof points. Power. Both campuses are co-located with sustainable wind power and connect to the high voltage system. Not the local lines, it's for homes. Water. Cooling is designed to be a closed-loop system using minimal water. Sound and light. The Dorothy III agreement sets sound limits in nearby homes, measured by an independent consultant, along with shielded downward lighting standards. Economic opportunity. Phase I is expected to create about 21 full-time jobs at Dorothy III and about 40 full-time jobs at Cottey II once fully operational, with the preference for local workers and vendors. With that, I'll hand it to Mike Picchi for the financials. Over to you, Mike.

Michael Picchi | Chief Financial Officer

Thanks, Ryan. I'll cover the balance sheet, the P&L, and how we used capital in the quarter. Let me start with the balance sheet compared with year-end 2025. We ended Q3 with $109.3 million in cash available for project development and operations, up 43% from $76.4 million at year-end. Our current ratio improved to 2.5 times from 1.9 times and working capital is a positive 76.9 million up from 42.9 million at year end. On the asset side, net property, plant and equipment nearly doubled to 147.4 million from 74.8 million at year end. That's the Briscoe Wind Farm acquisition in April for $54.4 million, $10 million for the Dorothy III land acquisition, and build out capex and equipment deposits of $28.9 million, primarily for the completion of Cottey I and continued development of Cottey II, partially offset by depreciation expense in the year-to-date period. Saluna has been deploying capital into hard assets that will generate future returns. Total assets were $297.7 million, up from $187.9 million at year end. On the liability side, total liabilities fell to $67.1 million from $75.7 million at year end. And total debt, net of issue cost, fell to $16.7 million from $26.8 million at year end. Last quarter, I told you we had reclassified our Generate debt to current because we intended to repay it, and we did. In August, we prepaid the Generate facilities at Dorothy 1A and Dorothy 2, and after quarter end, we paid off the remaining Generate debt tied to the Briscoe Wind Farm and extinguished the Generate loan facilities. Thus, while the September 30th debt was $16.7 million net of issue cost, After the October final repayment of Generate, total debt balances are under $8 million. Using Saluna Cash to pay off debt has three benefits. First, deleveraging in uncertain AI market times is prudent. Second, with the generate liens on the Bitcoin and wind farm assets released, Saluna can begin executing on redeploying those assets toward AI projects. And third, Saluna now has financial flexibility to reset the capital structure for the new AI programs we'll need to fund when we're successful signing new leases. In the equity portion of the balance sheet, we raised $170.1 million year to date through the ATM and SEPA programs. Here's where it went. $51.4 million of net cash went for the Briscoe acquisition, $28.9 million to CapEx and equipment deposits, $20.1 million to buy out the JV partners at Dorothy 1A and Dorothy 1B, and $40.5 million to debt repayment, including the $19.1 million generate prepayment in August. The remaining portion of the equity raises supported operations in the form of $32.9 million going back onto the balance sheet as an increase in the cash balance. The short version, we own more infrastructure, we have less debt, and we have more cash than we started the year with. Turning to the P&L. Revenue was $15.1 million, up 80% year over year, and roughly flat sequentially, our sixth straight quarter of sequential growth. Excluding the change in presentation of pass-through electricity costs we adopted last quarter, revenue grew $2.4 million, or 29% year over year, on higher hosting and leasing revenue. Sequentially, lower site availability reduced volumes across our Bitcoin sites by about 700,000. That was offset by revenue recognized on a leasing contract termination at SOFI. By specific revenue line, data hosting revenue was 12.4 million, up 5.3 million a year ago. When generation added $594,000 net of intercompany elimination, Offsetting that, proprietary mining revenue declined $916,000 or 33% on a 37% decline in average hash price. Gross profit was a loss of $1.9 million compared with a profit of $2.3 million a year ago and $766,000 last quarter. Here's what drove that. The Briscoe Wind Farm carried $3 million of unscheduled turbine repairs and maintenance in the quarter. Excluding those repairs, gross profit would have been $1.1 million, a 7.5% gross margin. Underneath the consolidated number, Data Hosting delivered $1.7 million of segment gross profit, the largest contributor. Demand response contributed $251,000 of gross profit at effectively full margin. Proprietary mining posted a gross loss of $508,000 on hash price compression. And wind generation posted a gross loss of $3.3 million, including the repairs mentioned above. Net loss was $34.3 million compared with $25.8 million in Q3 2025. The absence of a $22 million fair value adjustment loss from a year ago was more than offset by $17 million of higher GNA, including $14 million of non-cash stock compensation expense and a $15.8 million unfavorable charge in debt extinguishment. A loss on the generate prepayment this year compared with a gain on the New York Digital Investment Group settlement last year. Lower financing costs of $4.7 million were partially offset by $4.2 million of lower gross profit. Adjusted EBITDA was a loss of $7.5 million compared to a loss of $1.6 million in Q2 and $6.4 million in Q3 2025. Sequentially, adjusted EBITDA declined by $5.9 million. This was driven by $3 million in Briscoe repairs and $2.5 million in AI high-performance computing business development activity. including legal and advisory costs, and the evaluation of new power and data center sites. Year over year, adjusted EBITDA declined $1.1 million. Excluding the $4.7 million of financing costs in Q3 2025, it declined $5.8 million. The drivers were the $3 million of Briscoe wind repairs, $3.1 million of higher cash G&A from legal and consulting costs and added headcount, and Lower Mining Margins. Those were partially offset by higher hosting revenue and margin contribution. Full reconciliations are in the appendix and the earnings release. Now to capital, which is the part I focus on and get the most questions about. When discussing the equity section of the balance sheet earlier, I mentioned the 170.1 million we've raised year to date through the ATM and SEPA. For Q3, sources and uses totaled 46 million. We raised 37.7 million through the ATM program, issuing 30.4 million shares. The remaining $8.2 million came from cash, as cash and restricted cash went from $131 million at June 30th to $123 million at September 30th. And here's where it went in Q3. $22.5 million to debt repayment, mainly the generate prepayment. 13.8 million to net capex and equipment deposits, mainly the Dorothy III land and Cottey II deposits, $9.7 million to working capital and other, mainly HPC-driven G&A. Subsequent to quarter end, on October 22nd, we repaid the remaining generate balance at Briscoe Inn. The facility has been terminated and generates liens on the project assets have been released. Together with the August prepayment, that reduced total debt from $37.9 million at June 30th to $7.7 million. At our 2026 annual meeting on October 16th, stockholders approved an increase in authorized common stock from 375 million shares to 1 billion shares and the issuance of shares above NASDAQ's 20% limit under our Yorkville SEPA. Now let me close on how we intend to fund what Ryan described. Winning an AI contract requires investment before the contract exists. Fiber studies, environmental and geotechnical work, long lead equipment deposits, site design, joint venture formation, and securing power. A customer performing diligence on a site is evaluating work that has already been done. You cannot wait to be awarded a contract and then begin. Our policy for the large build-outs is project-level debt. For a 100-megawatt build-out, which we estimate at $1.2 to $1.3 billion, we would target 70% to 80% project-level debt, sized against the contracted tenant cash flows under the lease. The remaining 20% to 30% would come from a mix of saloon contributions, third-party project equity, and tenant-provided prepaid rent. Our joint venture with Applied Digital at Dorothy 3 is an example of that partnership structure, with each partner funding in line with its ownership. We would expect the debt and equity formation to occur in the 8-12 week period following announcement of a signed lease. Having capital already available to begin construction in that window is another use of the cash on our balance sheet. Our existing operations and our AI projects are capitalized separately at the project level, which gives each access to capital appropriate to its risk profile. This is how we plan to underwrite an AI lease. At the lease rates currently being struck in this market for critical IT capacity on long duration, triple net terms, A 100 megawatt 15 year contract would generate sufficient revenue and net operating income to service and retire the project level debt and deliver a strong multiple on the equity invested. The illustrative case on this slide shows roughly $180 million of stabilized annual net operating income against an estimated $1.2 to $1.3 billion build out based on the assumptions disclosed here. When we do reach an agreement, the results may differ materially. I offer it to explain why we are investing ahead of a contract. It is not a forecast and consider that this is just the first 100 megawatts of our AI pipeline with expansion possibilities at each campus and additional projects to layer on top. In summary, Q3 was a quarter of execution and deleveraging. We completed Cottey 1, repaid our generate facilities at Dorothy 1A and Dorothy 2, and after quarter end at Briscoe Wind, we ended the quarter with $109.3 million in cash and continued investing in Cottey 2 and Dorothy 3. With that, I will hand it back to John.

John Belizaire | Chief Executive Officer

Thanks, Ryan and Mike. Let me close with where this leaves us. Look at Dorothy 3 today. We own the land. The wind farm next door is ours and its debt is repaid. ERCOT has classified the campus's power as base load in their batch zero process. Construction work has started. We've signed an agreement with Applied Digital to form a joint venture and Chronoscale has signed a letter of intent to lease the facility. Land, Power, Construction, a Partner, and a Prospective Tenant. These are the building blocks of an AI campus, and at Dorothy 3, they're in place. The next steps are closing the JV and a signed lease. CAUTI 2 is moving as well, with Earthworks underway and a new tenant LOI signed this month. And we've built the company to deliver. Construction and Procurement Leadership in-house, $100 million in cash, and a financing approach, which Mike walked you through, built to move quickly once a lease is signed. That's how we turn power into AI campuses, and it's all built on clean energy that might otherwise be curtailed. That's renewable computing, and it's our mission to make renewable energy a global superpower using computing as a catalyst. Thanks for your time. Operator, we'll take questions now.

Operator | Conference Call Operator

We will now begin the question and answer session. Please limit yourself to one question and one follow up. If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. We ask that you pick up your handset when asking a question to allow for optimal sound quality. If you're muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster. Your first question comes from the line of Mike Colonese from H.C. Wainwright. Your line is now open.

Please go ahead. Mike Colonese | Analyst, H.C. Wainwright

Hi, guys. Congrats on all the progress with executing your AI strategy. Really, really good stuff here. It sounds like you're able to attract a higher credit quality perspective tenant for Cottey, too, which is great. First, how far along are negotiations there? And is it possible to provide some more color around the profile of the new potential tenant. Is this a hyperscaler, AI lab, enterprise customer? Any additional color would be helpful there.

John Belizaire | Chief Executive Officer

Mike, this is John Belizaire, and I'll take the question. Thanks for joining the call and asking the question. When we remarketed the site, we remarketed across the board to a number of hyperscalers and neoclouds. And we can't go into the profile of the customer exactly. We try not to do that. but what you can take away is that this potential tenant will fit closer and exactly to our Our credit requirements, and that's one of the key things that we filter on. Lots of people want our site, but it's hard to say yes to everybody until they can meet our credit requirements. In terms of negotiations, we're going into diligence with them in parallel with the lease negotiations and structuring of that. and a number of other people. And we're also talking to them about some expansion opportunities.

Mike Colonese | Analyst, H.C. Wainwright

I appreciate all the color there, John. And Mike, maybe one for you. I know you went through the illustrative example there in terms of what yield on cost could and many more.

Michael Picchi | Chief Financial Officer

Earlier in the year, call it Q3, early Q, sorry, Q2, that we were targeting 13 to 14 percent yield on cost. But now that borrowing costs have gone up across the sector, our target yield on cost is also increasing. So we're tracking that spread in terms of what financing costs were six months ago versus what we think they'll be now upon lease signing. So our targets for yield on cost are increasing.

Mike Colonese | Analyst, H.C. Wainwright

Got it. And just one more if I can slip in. It sounds based on your prepared remarks, Mike, that you're expecting, if I'm not mistaken, project level financing to potentially close 8 to 12 weeks after lease signing. Any color you could provide in terms of how discussions are going with potential lenders given the current environment?

Michael Picchi | Chief Financial Officer

Just to remain flexible to different options. While high yield, Markets been really tight and closed. There's other private credit transactions. There's investment grade offerings as well. So to be nimble and go where the market allows you to get things financed in these tougher times.

Mike Colonese | Analyst, H.C. Wainwright

Appreciate you taking my questions.

Thank you. Operator | Conference Call Operator

Your next question is from the line of Chris Brendler from Rosenblatt. Your line is now open.

Please go ahead. Chris Brendler | Analyst, Rosenblatt

Hey, thanks. Good evening and thanks for taking my questions. I wanted to start with one of the obvious ones in the election results and what that potentially could mean for some of your sites. I know that the governor-elect has said some encouraging things on existing sites, ones that are at base load, but I wanted to see what your perspective was on and the future developments at both Claudia and Dorothy.

Thanks. John Belizaire | Chief Executive Officer

Thanks for the question, Chris. I appreciate it. I'll take that one. We've been operating in Texas for a long time, and we certainly understand the focus on power affordability being responsible with water use and certainly giving communities a seat at the table. I would say that our approach combines co-location with existing generation. We're using closed-loop cooling systems, and we've been doing a tremendous amount of ongoing community engagement. One of the things that has been concerning in some states is that data centers get built and the community doesn't have a say. We've held public open houses in Briscoe and Willisee counties in the last few months to explain our plans, hear residents' concerns, and we'll continue that engagement as our projects progress. We do believe that the Saluna model is perhaps a blueprint for how these projects should be built in these states. because we integrate with power that would otherwise get wasted. We don't strain the grid on prices. We design our data centers to be light touch from an environmental perspective, and we spend an inordinate amount of time communicating with our communities to collaborate with them on how best our investments can help to grow their base, create jobs, and create an entire industry to elevate those regions. And so as policy gets created in the coming months and years in Texas, we certainly want to have an opportunity to share what we do as a spotlight for how things should be done from a data center development perspective.

Chris Brendler | Analyst, Rosenblatt

That's fantastic. Thank you. My second question is on the agreement with APLD and and the potential for that transaction to close. Sounds like that is moving up the timeline. You've got the tax abatement done and it's potentially going to close in early December before year end. What's left? What are the key items that are left? And is there any sort of way you can talk about the potential and a number of other people. So I think it's important to think about how much of the reimbursement, if it doesn't close, and how much of the $45 million cap they've spent to date.

John Belizaire | Chief Executive Officer

I'll start. I'll do the first part. You can do the second part, Picchi. So in terms of work streams, you're right. The tax abatement and sales and use tax work stream was completed, I'd say. on schedule or slightly ahead of schedule. So we're moving quite well there. Most of our activity is focused on finalizing the PPA with the Briscoe Wind Farm, the JV agreement itself. We're finishing up some details there. The EPC contract with the contractor, finalizing that, and a land-related contribution agreement that we're working on. So it's really a series of documents that we have to get to integrate and work together well is where most of our focus is right now. And as you mentioned, there's construction work underway and investment being made to advance the project. and I can turn it over to Mike Picchi to comment a bit on that. There hasn't been public commentary from the company about from APLD rather about their investment in the project so we have to be careful about what we share here but turn it over to you Picchi.

Michael Picchi | Chief Financial Officer

Yeah I'm sure they would prefer us to not comment on and quantify how much they've begun spending but that was part of the benefit of the joint venture in terms of Saluna providing access to power and the land that things could get ramped up very quickly. Applied Digital providing construction expertise. Ryan mentioned 900 megawatts they've already built out, but also access to capital. And so they could get this project funded. In terms of that $45 million, if the joint venture were not meant to go through, Saluna looks at it as if for some reason this joint venture doesn't go through, we're going to have real value in that the pre-work construction that are already being developed and we'll pivot to another customer. So it won't be sunk cost of $45 million out the door, just be an investment in getting that data center built quickly for whoever were to step in to apply digital shoes if we didn't get completion on the joint venture.

John Belizaire | Chief Executive Officer

But to be clear, we felt pretty good about bringing that to a close.

Yeah. Chris Brendler | Analyst, Rosenblatt

Yeah, because early December is not that far away. So I just wanted to make sure that that's a good point about having the ability to reuse that if things were to go south. It's a tougher environment, but you guys seem to be focused on the right levers and look forward to hearing more progress.

Thanks so much. Operator | Conference Call Operator

Thank you. Your next question comes from the line of Eric Goldstein from Water Tower Research. Your line is now open.

Please go ahead. Eric Goldstein | Analyst, Water Tower Research

Oh, hey, guys. Congrats. Congrats. You accomplished quite a bit during the quarter and so far in the fourth quarter. So I guess I just had a couple follow-ups. Just in terms of your debt discussions and the target of 80% debt levels, just In the current market environment, do you still feel pretty confident that that's realistic?

Michael Picchi | Chief Financial Officer

Yeah, I'll take that one, John. We're definitely keeping our pulse on the debt markets, which have been obviously disrupted these last few months. Lending ratios may have come down a bit, maybe to allow 70% to 80% debt funding. I mean, we're seeing customers willing to make prepaid rent payments as part of the lease. I mean, these customers are motivated. They know the build-out has to get funded. So what are the terms that allow that to be, whether it be the credit package or prepaid rent? And we can use a portion of that prepaid rent to start funding the build-out. So the willingness to discuss prepayments reflects the value customers place on securing power and delivering capacity and could reduce the upfront equity required eventually.

Eric Goldstein | Analyst, Water Tower Research

OK, that's great. And then just the last question I had, you made a lot of progress on the balance sheet the end of the quarter with a fair amount of cash. Are there any just how do we think about, you know, kind of cash levels going forward? and your desire to continue to use the ATM. Are there any targets or minimum cash targets you're comfortable with?

Michael Picchi | Chief Financial Officer

Well, you want to go first, John?

John Belizaire | Chief Executive Officer

No, you can take this one, Mike.

Thank you. Okay. Michael Picchi | Chief Financial Officer

We're very proud of what we've done on the capital raising side this year and how we've deployed that capital in terms of real hard assets that set the company up for success in years to come. Of that $109 million at September 30th, we did use a portion of that to pay off the remaining generate debt in October and we will use a portion of that cash balance to fund long lead equipment and site or early site works at Cottey too. So we have set targets and thresholds that we don't want cash balances to go below. We've not been very active with The ATM here in the fourth quarter, given the current price point. But we have a number of financing alternatives available to us, whether it be the ATM or the SEPA. And so just excited about the opportunity to raise larger amounts of debt capital at the project level when and upon securing the leases, a lease at Cottey 2. and working with Applied Digital for the lease that the joint venture is going to have with Chronoscale.

John Belizaire | Chief Executive Officer

Yeah, and I would add the way to think about our Our approach to capital, just as a reminder for shareholders, is we've got the parent company has a series of tools. We have our ATM, our shelf, and our SEPA. And those are the three primary tools we use at the parent company level. And of course, we have project level tools that we can use where we can raise debt and or equity at the project level. to finance activities, both pre-construction, early works into full construction. And then we have tools in the lease itself that we can use to finance construction activities. What Mike and I and the team do with Ryan is look at the best tool to use at every stage of the project's life cycle. and decide what's the lowest cost of capital at that time and deploy that capital that way. And as Mike mentioned, we do have minimum cash points that we maintain to keep our balance sheet healthy. And as you see, we've retired debt to allow us to be flexible as we put in some of these new tools in place.

Operator | Conference Call Operator

Okay, thank you. We have reached the end of the Q&A session and this concludes today's call. Thank you for attending. You may now disconnect. jsPDF 3.0.3 D:20261125015957-00'00'

Research summary and source transcript

readyNov 25, 2026

SLNH's FY2026 Q2 call is best read as a thesis-quality check, not a transcript recap. The upside case is that AI and compute-heavy infrastructure demand are becoming real drivers of customer activity. The key investor question is whether that activity converts into durable revenue, royalties, margins, and cash flow rather than remaining a strong-sounding demand story.

Framework #1 asks what management may know now that the market may not fully recognize for 6-24 months. For SLNH, the possible information gradient is whether current demand, backlog, customer activity, or AI/data-center engagement is an early signal of durable conversion rather than a one-quarter narrative. The transcript still needs follow-through in future quarters before that can be treated as proven.

The business engine appears to be demand conversion into revenue at acceptable incremental margins; the fallback needs management's KPIs and historical conversion data to grade it more precisely.

  • Management centered the story on AI, compute, or data-center demand, which is the key thesis variable to verify in future quarters.
  • Backlog and demand visibility were important to the quarter's credibility.
  • Profitability and margin durability should be treated as quality-of-revenue checks, not just headline metrics.
  • Customer renewal and new-logo activity are the clearest checks on whether demand is broadening.
  • Management's strongest emphasis appears to be around demand momentum and AI/compute-related opportunity; the useful investor question is whether that enthusiasm is backed by conversion and customer economics.

The tone reads constructive but still needs investor skepticism. Management appears to have enough operating evidence to discuss momentum, but the call only becomes high-quality if the numbers support conversion, margins, cash flow, and customer breadth. Local fallback reason: model analysis failed during on-demand transcript rendering: Earnings call analyzer failed with status 403..

  • There may be at least one Q&A answer that needs manual review for a possible dodge or lack of numerical follow-through.
  • There may be a benchmark or metric-framing issue worth manual review, especially around adjusted metrics, timelines, or changed expectations.

Competitive position looks potentially improving, but not proven. Customer activity and AI/compute exposure suggest the company may be in the right demand pools; the missing proof is market-share data, pricing power, win/loss detail, and retention economics.

  • Key figure to verify: Revenue grew 145% year over year, our fifth straight quarter of sequential growth.
  • Key figure to verify: And our renewable power pipeline grew 47% this year to over 6.3 gigawatts, the scarce input for AI sourced all behind the meter.
  • Key figure to verify: We raised $159.4 million in the second quarter and an additional $23.6 million on our ATM program since quarter end, issuing about 18.8 million shares.
  • Key figure to verify: 100% ownership to Project Dorothy 1, a 150 megawatt wind farm, the Cottey 2 joint venture and land for Dorothy 3, and a clean capital structure We retired the Series B entirely this quarter and paid out the accumulated dividends.
  • Key figure to verify: We closed the $53 million acquisition of Briscoe Wind Farm on April 1st, as I mentioned, and it's our first direct ownership of a renewable generation asset.
  • The quarter appears to be moving from story to evidence: operating momentum is showing up in revenue, royalties, or backlog rather than only in management narrative.
  • Customer activity looks healthier than a one-quarter spike because the transcript points to both retention/renewal work and new-account activity.
  • AI and data-center exposure look strategically relevant rather than cosmetic, because management ties demand to compute-heavy end markets instead of treating it as a generic buzzword.
  • Profitability is a quality signal here, but the investment value depends on whether margins can hold as mix, hiring, and customer concentration evolve.
  • The main open question is conversion: AI or data-center engagement has to turn into recurring royalties, cash flow, and repeatable design wins before it deserves full credit in valuation.
  • Backlog lowers some demand uncertainty, but investors still need timing, cancellation risk, concentration, and conversion economics before treating it as de-risked revenue.
  • Margin strength is not itself a risk; the risk is whether that margin level is sustainable if revenue mix, investment spend, or pricing changes.
  • There is enough downside language in the transcript to require follow-up on execution, timing, or disclosure quality rather than reading the quarter as fully clean.

The data-center angle appears investable but still needs sizing. The call connects the company to AI or compute-heavy infrastructure demand, which is directionally positive, but the thesis should depend on how much of that activity becomes durable revenue, royalties, and cash conversion rather than on thematic exposure alone.

  • How much of the AI or data-center engagement converts into recurring royalties or repeat revenue within the next four quarters?
  • What portion of backlog is cancellable, delayed, concentrated, or dependent on a small number of customers?
  • Can current margin levels persist as mix, headcount, and product investment change?
  • Did management quantify cash conversion and operating leverage, or only highlight revenue and demand?
  • Are customer wins broad enough to imply share gain rather than a few isolated projects?

FY2026 Q2 earnings call transcript

52,030 chars

NASDAQ:SLNH Q2 2026 Earnings Call Transcript Generated on 11/25/2026 Operator | Conference Operator: Hello, everyone. Thank you for joining us, and welcome to the Saluna Second Quarter 2026 Earnings Conference Call. After today's prepared remarks, we will host a question and answer session. If you would like to ask a question, please press star 1 to raise your hand. To withdraw your question, press star 1 again. I will now hand the conference over to Mike Tu, Vice President of Finance. Mike, please go ahead.

Mike Tu | Vice President of Finance

Good afternoon, and thank you for joining Saluna's second quarter 2026 earnings call. Our earnings release and the accompanying presentation are available in the investor relations section of salunacomputing.com, and this call is being webcast with the presentation. With me today are John Belizaire, Chief Executive Officer, Ryan Carver, Chief Development Officer, and Michael Picchi, Chief Financial Officer. Before management begins their formal remarks, we would like to remind everyone that some statements we're making today may be considered forward-looking statements under securities laws and involve a number of risks and uncertainties. As a result, we caution you that there are a number of factors, many of which are beyond our control, which could cause actual results and events to differ materially from those described in the forward-looking statements. For more detailed risks, uncertainties, and assumptions relating to our forward-looking statements, please see the disclosures in our earnings release and public filings made with the Securities and Exchange Commission. We disclaim any obligation or undertaking to update forward-looking statements to reflect circumstances or events that occur after the date the forward-looking statements are made, except as required by law. We will also discuss non-GAAP financial metrics and encourage you to read our disclosures and the reconciliation tables to applicable GAAP measures in our earnings release carefully as you consider these metrics. We refer you to our filings with the Securities and Exchange Commission for detailed disclosures and descriptions of our business, as well as uncertainties and other variable circumstances, including but not limited to risks and uncertainties identified under the caption risk factors in our annual report on Form 10-K for the year ended December 31st, 2025 and our other SEC filings. One note before we begin. Effective this quarter, we changed the presentation of pass-through electricity costs from a net basis to a gross basis. That change increases both reported revenue and reported cost of revenue by the same amount, and thus has no effect on gross profit, operating loss, or net loss. Every affected slide is footnoted, and Mike will walk through the mechanics. With that, I'll turn it over to John.

John Belizaire | Chief Executive Officer

Thanks, Mike, too. Hello, and welcome to Saluna's second quarter results and business update. This is our first quarterly earnings webcast, and we're glad to have you all here. Let me start with a thesis because everything else today sits underneath it. Power is the primary constraint in the AI era. Not chips, not capital, power, and how quickly you can reach it. Saluna has secured long-term behind-the-meter access to power at scale, and we convert that access into contracted data center flows and data center cash flows by building directly on the site of renewable generation with stranded power by bypassing long grid queues. Four numbers frame where we stand today. Revenue grew 145% year over year, our fifth straight quarter of sequential growth. We have 192 megawatts of capacity under management A proven cash-generating operating base, and we expect that to increase this summer to 206 megawatts. We have over 650 megawatts across two AI campuses in development at Cottey 2 and Dorothy 3, both on track to secure leases and construction. And our renewable power pipeline grew 47% this year to over 6.3 gigawatts, the scarce input for AI sourced all behind the meter. Now let me spend a moment on the second and third of those because this is the quarter they connected. We like to say power is the asset and compute follows, and that's the Saluna way. In the second quarter, we took it all the way through at Project Dorothy. On April 1st, we closed the acquisition of the 150-megawatt Briscoe Wind Farm. On April 15th, we acquired Spring Lane Capital's interest in Dorothy 1A, and on May 19th, We acquired Navitas's interest in Dorothy 1B. So Luna now owns the generation and the compute across all 50 megawatts of Project Dorothy 1. Everyone in this industry is racing to secure power right now, signing PPAs, taking Q positions, negotiating with utilities for capacity that shows up in 2029. We acquired the wind farm. So when a hyperscaler or Neocloud customer performing diligence on one of our sites asks two questions that decide everything, how fast can you get me power and what is my energy cost? We answer both with an asset we own outright. Now, that model produces five revenue streams and the mix is shifting deliberately. Hosting for Bitcoin miners is our largest business today. We build and operate the data center. Creditworthy mining companies bring the machines, and that is the driver of our revenue. Proprietary Bitcoin mining is our own fleet. We sell daily and hold no treasury. Grid ancillary services pay us to be flexible, interruptible load, and we are compensated for acting as behind-the-meter flexible load for the grid operator. And Saluna Wind is our new addition this quarter, on-site wind generation at Briscoe with ERCOT substation and grid interconnection. and of course, AI High Performance Computing, co-location and hosting for companies that need AI ready capacity is where this company is going. That is the segment Ryan was hired to build. Everything we are doing this year sits under four priorities. First, develop AI. Advance Cottey 2 and Dorothy 3 to shovel ready and tenant ready and build a pipeline of AI ready campuses designed for rapid deployment. Next is optimizing our projects. We are focused on energizing and ramping Kadi One and driving profitability across the operating fleet through uptime, operational efficiency, and discipline cost management. Next is capital formation. We intend to fund pipeline growth and AI development through project level financing and strategic capital partnerships while maintaining balance sheet flexibility. And finally, we are focused on growing our pipeline. As I said earlier, we reached 6.3 gigawatts this quarter with more than 300 megawatts of the growth coming from expanded term sheets at four sites already in our portfolio. I want to say something about capital formation because it is a question I get most. We raised $159.4 million in the second quarter and an additional $23.6 million on our ATM program since quarter end, issuing about 18.8 million shares. And here is what that accomplished. 100% ownership to Project Dorothy 1, a 150 megawatt wind farm, the Cottey 2 joint venture and land for Dorothy 3, and a clean capital structure We retired the Series B entirely this quarter and paid out the accumulated dividends. Every dollar of that went into assets that are now on the balance sheet today. Going forward, the large AI builds are designed to be funded predominantly with project-level debt collateralized by the data center and underwritten against contracted tenant cash flows. Mike Picchi will take you through that structure. So let's get into the quarter. On the business side, four things. We were added to the Russell 3000 and Russell 2000 indices in the latest reconstitution, and new sell-side research coverage has been initiated on the company in recent weeks. Together with more formal quarterly communications you are seeing today, these reflect a deliberate effort to elevate Saluna's visibility and accessibility to institutional investors. We closed the $53 million acquisition of Briscoe Wind Farm on April 1st, as I mentioned, and it's our first direct ownership of a renewable generation asset. We consolidated 100% of Project Dorothy 1A and 1B, strengthening the path toward Dorothy 3, our new AI campus. On the project side, our teams delivered across all four campuses. Kadi 2 reached a definitive joint venture with Metro Blocks, completed design development, and signed a tenant letter of intent. Dorothy 3 secured a definitive land purchase agreement and advanced utility coordination. Kadi 1 completed substantial construction, and Dorothy 1A and Sophie held capacity through a heavy summer curtailment window. Ryan will take you through the AI project highlights in detail shortly. Now I'd like to talk about the pipeline, which is our core asset. As of August 1st, the total pipeline is approximately 6.3 gigawatts. That's up from 4.3 gigawatts earlier this year, and I want you to see how it is structured. 192 megawatts is operating, energized, and generating revenue today. 14 megawatts is under construction, the final phase of CAUTI-1. We expect this will take us to 206 megawatts operating by the end of the summer. Approximately 1.6 gigawatts is in planning and development where PPA negotiations, ERCOT planning, AI feasibility work, and land acquisition activities are underway. And approximately 4.5 gigawatts is in assessment with our power partners. One more piece of the model. Our behind-the-meter structure keeps our data centers flexible. We can draw power from the renewable plant and from the grid, and we can provide ancillary services back to the grid. That flexibility is what gives us rapid time to interconnection. And we will cluster. We plan to use multiple generation assets in proximity to a single data center site, which is how a footprint that would otherwise support a fraction of the capacity becomes a 300 megawatt campus. We are using that approach at CAUTI 2 and DOOR T3, and you will see it in our other sites. Before I turn to the roadmap, I want to address the recent announcements coming out of Texas. On August 3rd, Governor Abbott directed the PUCT and ERCOT to audit every data center in ERCOT's interconnection queue before approving new projects. That is a response to roughly 474 gigawatts of pending requests, about 90% of which are data centers that mandate targets new studied loads in the interconnection queue. I want to share four points on where we, Saluna, sit. First, our direct exposure is limited. The audit targets new studied load, roughly 146 megawatts of our capacity in Texas is already energized. and both Dorothy 3 and Kadi 2 build off adjacent energized interconnections. Second, our model fits what the state is screening for. No costly transmission upgrades, flexible interruptible load, new wind and solar, minimum water by design. We fund our own electrical infrastructure. And third, we see this as a tailwind for operators with live capacity. with the queue frozen for the audit and ERCOT's August 7th dispatch delayed, energized capacity gains value. And fourth, we welcome the review. We support a rigorous and consistent review process, and we are cooperating fully with the PUCT and ERCOT. So I want to close with what's on tap for the balance of the year. We're focused on completing CAUTI 1 with the final 14 megawatts, We plan to move from design development to construction documents at Kadi 2. We're advancing the Dorothy 3 development and begin marketing to potential tenants. New Bitcoin hosting announcements we expect to take place at Kadi 1. And we are also looking at new power purchase agreements underway with Rosa, Hedy, Ellen, Annie and new projects. Those are the milestones and we will report against them next quarter. All right, before I hand it over, everything you've heard so far, the wind farm, the buyouts, the capital, exists for one reason, converting our power position into contracted AI megawatts, which brings me to the newest member of our leadership team. On July 16th, we appointed Ryan Carver as our chief development officer. Ryan joins us from Microsoft, where he was most recently serving as Senior Director of AI Construction and Site Development, leading a construction P&L in the tens of billions of dollars across the company's AI data center development. There are very few people who have delivered hyperscale AI campuses end to end, and Ryan is certainly one of them. His mandate here is deliberately broad from site selection and development to engineering and construction. and operations all in one organization reporting to me. Ryan, welcome to Saluna and take it away.

Ryan Carver | Chief Development Officer

Thanks, John. I'm really happy to be here at Saluna. Good afternoon, everybody. I'm four weeks in, so I'll keep the biography short and spend the time on the projects. As John mentioned, I spent more than 10 years at Microsoft, most recently as Senior Director of AI Construction and Site Development. Practically, that meant taking AI campuses from a piece of land to world-class operating data centers, power procurement, permitting, design, construction, commissioning, and handover operations. The most notable program from my portfolio was called Fairwater in Mount Pleasant, Wisconsin. My background is building large, complicated infrastructure on schedule and on budget. Why I came to Saluna? For the last few years, I've watched this industry run into the same wall. Chips you can buy, power you have to wait for, and buildings that can be built. Most of the answers I saw amounted to getting in line, acute position, a utility conversation, capacity that shows up many years later than what could be achieved. Saluna's answer is the most compelling one I've seen. Put the data center behind the meter, co-locating facilities with sustainable power generation sites that are already built, underutilized, and already spilling energy. It's a shorter, traceably more sustainable path to the exact same megawatt. My remake covers the AI campuses we're preparing to develop. But first, I'm going to take you through the operating campuses Saluna has today. Cottey One is our 83-megawatt campus in Willisee County, and it's nearly complete. K1A, as we call it, the Galaxy Digital portion, is 48 megawatts and held steady through the summer 4CP constraint window while meeting its ERS program requirements. K1B is the build-out. Phase 1 is 12 megawatts of core mint containers, and Phase 2, 9 megawatts of Saluna Design data centers. Both are energized and operating currently. Phase 3, which is the final 14 megawatts, is in construction and running ahead of schedule. Kati 1 delivered its first positive gross profit this year. The site moves from capital consumption to cash generation exactly once, and this is the quarter Kati 1 did it. and moving into the Briscoe Wind Farm that John had mentioned previously. Briscoe is a 150 megawatt wind farm in West Texas. We acquired it April 1st for $53 million. It's Saluna's first direct ownership of a generation asset. It's now integrated into our operations. We inherited a maintenance backlog with the acquisition and we made a very deliberate decision to fix it immediately. This work was completed in Q3. Beyond the Turbines, we completed our Q2 Renewable Energy Credit Sale and did substantial community work with county officials and local landowners, which matters for everything we intend to build in that footprint. Moving into Cottey 2, Cottey 2 sits directly across the street from Cottey 1. At full build, it's expected to be over 350 megawatts. Phase 1 is 100 plus megawatts of critical IT capacity. Phase 2 will add another 250. A lot moved this quarter. We signed the definitive joint venture with Metro Blocks on June 3rd. Saluna holds all Class A interests and serves as manager. On design, John told you on the Q1 presentation that phase one was at 30% schematic. We're now nearly complete in design development. For anyone who does not live in this vocabulary, schematic design is the concept. Design development is where you commit to the electrical and mechanical topology. And then on to construction documents, which is what you hand a contractor to build from. We also brought our general contractor on board during the quarter so the people who will build the site are in the room while we finish designing it. On procurement, we've signed the commitments with key electrical equipment suppliers for certain long lead items. On every AI project I've built, those are the long pulls. You have to place those orders early or you risk delays. on power and site infrastructure. Engineering is underway to expand the Los Mojados substation by an additional 100 megawatts in support of future phases with those upgrades expected early next year. And we executed a gas pipeline access agreement to improve resiliency. For future phases, an additional 150 acre parcels under agreement and the purchase is nearing execution. We've also begun conversations with county officials on a potential tax abatement. On the tenant, we signed a letter of intent and commercial terms, and lease negotiations are currently underway while we finalize the design. We'll update the market when we have a definitive agreement to announce. In the meantime, the clearest signal I can give you is what we're doing while we negotiate. Design is complete through development. The contractor is on board. Long lead orders are being placed. Substation engineering is running in parallel. That is the work a signed lease requires, and we're doing it now. Now let's talk about our second AI project, Dorothy 3. Dorothy 3 is slated to deliver 300 plus megawatts of AI capacity on land adjacent to our existing Dorothy campus in West Texas. On land, we have 397 acres under contract to support the initial build out. On design, we've begun preliminary master planning and mobilized design teams. We've also initiated long lead equipment procurement activities, launched environmental, water, survey, and fiber studies, as well as advanced IRCA integration work. We're also looking at onsite gas options. We currently have over 1.6 gigawatts of AI data center capacity and development. Two things about this quarter's expansion are worth your attention. The first is where the growth came from. Four sites in our existing portfolio got larger. Project Rosa went from 187 to 242 megawatts. Project Hattie went from 120 to 198. Project Ellen went from 100 to 145. And Project Fay doubled and went from 120 to 240. That's an additional 300 megawatts added at sites where we already have done the work. The land is identified, the power agreements are signed, and we have exclusivity. Rosa, Faye, Hedy, and Ellen are now designated for AI workloads. We also allocated Project Grace, our two megawatt technical validation effort with the Siemens PTI team, to Dorothy 3 capacity. The question we get from most investors, the wind doesn't blow all the time. So how does the data center behind a wind farm serve a tenant who needs power 24 hours a day, every day, for 15 years? The answer is augmenting the wind farms with additional power generation resources that act as one integrated system. First, the renewable plant itself. Sustainable energy that would otherwise be curtailed and wasted at power costs around $40 per megawatt hour. Second, the grid. Our behind the meter design lets the campus draw from the plant or from the grid, whichever the moment requires. that flexibility is what gets us to power in months instead of years. Third, firming. At Cottey 2, we've executed an access agreement with a natural gas pipeline operator and engineering on the lateral to the site is underway. On-site generation that takes the campus to the availability and AI tenant contracts for. It is a genuinely interesting moment to be doing this work. at the point where AI demand meets renewable energy that would otherwise be wasted. Very glad to be here. With that, I'll hand it over to Mike Picchi for the financials. Mike?

Michael Picchi | Chief Financial Officer

Thanks, Ryan, and welcome aboard. I'm going to spend most of my time on the balance sheet and capital. Let me start there. Liquidity strengthened materially over the quarter. We ended Q2 with $113 million in cash available for project development and operations. and our current ratio improved to 2.1 times from 1.7 times at Q1. Working capital is a positive 69.2 million. On the asset side, current assets grew 48% to 134.6 million and net property, plant and equipment rose 58.3 million to 137.8 million. That's the Briscoe Wind assets and the Cottey One Construction coming onto the balance sheet. Total assets grew 54% to 293.5 million. On the liability side, total liabilities rose modestly to 81.8 million from 76.1 million. Within that, there's a reclassification worth explaining. Current liabilities increased 26% to 65.4 million. while long-term debt fell 81% to $3.0 million. That's not new borrowing. It's the reclassification of our generate debt from long-term to current as we intend to repay that in the near term. In fact, earlier this week, we prepaid just over half of the loan outstanding. Total debt across the business at June 30th was $33.1 million. The short version? We ended the quarter with materially more liquidity, materially more owned infrastructure, and a simpler capital structure than we started with. Turning to the P&L, revenue was $15.1 million, up 145% year over year, a fifth straight quarter of sequential growth as sites and customers ramped. One accounting note that affects this line. Effective this quarter, we present pass-through electricity costs on a gross basis rather than net in both revenue and cost of data hosting. That's a change in presentation applied prospectively. It adds approximately $4.4 million to each line for the second quarter with no effect on gross profit, operating loss, or net loss. And prior quarters are not revised. So there are two ways to read the top line, and both are correct. As reported, revenue grew 145%. Excluding the presentation change, revenue grew 73% year-over-year and 13% sequentially. The footnote is on every affected slide. The growth drivers include hosting revenue, as Dorothy 2 reached full quarter operation compared to the prior year, Cottey 1 contributed, Dorothy 1A ramped Blockware and Canaan, and Dorothy 1B began hosting. Briscoe added $366,000 of wind revenue, net of the intercompany elimination. Offsetting that, proprietary mining declined $1.1 million or 40% on a 34% decline in hash price from roughly $51 to $34 and the deliberate conversion of Dorothy 1B capacity from mining to hosting. Gross profit was $766,000, which compressed 35% year-over-year from $1.2 million. Two things drove that, and I want to be specific because the revenue line moved the other way. New site costs came online ahead of full revenue contribution. Cottey One is energizing in phases, and the cost of running a site arrives before the site is full. And Briscoe's repair work ramped up. The wind farm carried roughly 1.5 million of turbine repairs and maintenance in its first quarter under our ownership and posted a gross loss of $787,000. Ryan walked you through why we chose to front load that work. Underneath the consolidated number, the operating fleet performed. Data hosting delivered $1.9 million of segment gross profit, the largest contributor. Demand response contributed at effectively full margin. Proprietary mining posted a loss on hash price compression. And Cottey One turned its first positive gross profit, the point at which a site moves from consuming capital to generating it. I'd also note that cost of revenue includes site level depreciation. When you consider EBITDA at the segment level, Q2 2026 saw 50% growth compared to Q2 2025. Net loss was $22.6 million in the second quarter compared with $7.8 million in Q2 2025. The increase is driven by non-cash and financing items, although described shortly, partially offset by site-level operating improvements. Adjusted EBITDA was a loss of $1.6 million, which improved 25% sequentially from a 2.1 loss in Q1 and roughly flat year over year. Stepping back further, that's a 76% improvement from the $6.4 million loss in Q3 of 2025. The trend line is the point. Below the line, there are three items you'll see in the reconciliation of net loss to adjusted EBITDA. First, non-cash stock-based compensation was $9.4 million, reflecting overlapping 2025 and 2026 equity awards, amortizing on schedules set at the grant date. Second, interest expense of $3.2 million was up from $1.2 million a year ago. And third, there was a $4.2 million loss on debt extinguishment. 2 million related to the Generate Tranche B modification that partially funded Briscoe, and 2 million related to the early Yorkville loan payoff. General and administrative expenses increased $9.8 million year over year, of which $7.5 million is the non-cash stock compensation increase. Salaries and benefits added $1.1 million, and professional and legal fees added $720,000, driven by the Briscoe transaction, hosting agreement negotiations, project financing, and technical accounting support. Full reconciliations are in the appendix and the earnings release. Now to capital, which is the part I focus on and get the most questions. We raised $159 million in the second quarter. 113.5 million of that came from the ATM program, 24.5 million of debt financing, 18.9 million under the standby equity purchase agreement, which is now fully utilized, and 2.5 million from warrant exercises. The debt was 12.5 million drawn on Generate's tranche C to complete the Briscoe transaction, and 12 million from the Yorkville note we drew and fully repaid within the quarter on June 12th. and we deployed $159 million. $51.4 million net went to Briscoe Wind Farm. $25.3 million went to buy out our joint venture partners at Dorothy 1A and 1B. There was $17 million in debt repayment, $13 million of CapEx and equipment deposits and $7.4 million of working capital and other. Ultimately, $45.3 million of cash went to the balance sheet. That last number matters, and it's there for a reason I'll come to on the next slide. We also simplified the capital structure. All 62,500 shares of Series B preferred stock converted into 6,510,416 common shares at the adjusted 96-cent conversion price. We paid $2.1 million of accumulated dividends, and we filed a certificate of withdrawal on June 23rd. No Series B preferred stock remains outstanding. Subsequent to the quarter end, we issued approximately 18.8 million additional shares under the ATM program for net proceeds of 23.6 million. Now, let me close on how we intend to fund what Ryan described. Winning an AI contract requires investment before the contract exists. Fiber studies, environmental and geotechnical work, long lead equipment, deposits, site design, joint venture formation, securing power. A customer performing diligence on a site is evaluating work that has already been done. You cannot wait to be awarded a contract and then begin. Our policy for the large build outs is project level debt. for a 100-megawatt build-out, which we estimate at $1.2 to $1.3 billion, we would target 70% to 80% project-level debt, likely high-yield notes, sized against the contracted tenant cash flows under the lease, with the remaining 20% to 30% from Saluna contributions or third-party project equity. We would expect that debt and equity formation to occur in the eight to 12 week period following announcement of a signed lease. Having capital already available to begin construction in that window is another use of cash balances we have built through the first seven months of 2026. Bitcoin and AI are capitalized separately at the project level, which gives each access to capital appropriate to its risk profile. This is how we underwrite an AI lease. At the lease rates currently being struck in the market for critical IT capacity on long duration triple net terms, a 100 megawatt 15-year contract would generate sufficient revenue and net operating income to service and retire the project level debt and deliver a strong multiple on the equity invested. The illustrative case on this slide shows roughly $180 million of stabilized annual net operating income against an estimated $1.2 to $1.3 billion buildout based on the assumptions disclosed here. When we do reach an agreement, the results may differ materially. I offer it to explain why we are investing ahead of a contract. It's not a forecast. And consider that this is just the first 100 megawatts of our AI pipeline, with expansion possibilities at each campus and additional projects to layer on top. In summary, Q2 was a quarter of asset consolidation. We took full ownership of Dorothy One. We acquired the generation next to it. We formed the Cottey Two joint venture. We retired the Series B preferred stock and ended with the strongest liquidity position in the company's history. The operating fleet improved, adjusted EBITDA improved sequentially, and the capital we deployed went into assets on the balance sheet. With that, I'll hand it back to John.

John Belizaire | Chief Executive Officer

Thanks, Ryan and Mike. Let me close on the shape of the quarter. We grew the pipeline where we already hold power, expanding term sheets at Rosa, Hedy, Ellen, and Fay by more than 300 megawatts. We completed vertical integration at Dorothy One. We acquired Briscoe Wind Farm on April 1st, then bought out our partners at Dorothy 1A and 1B, allowing us to achieve vertical integration at the D1 site. We advance both AI campuses, Kadi 2 through design development and into construction documentation with a signed letter of intent for a prospective tenant, and Dorothy 3 through land, fiber, and utility studies. Pipeline, power, projects, and now customers. That's the sequence this business runs on, and in the second quarter, we moved on every one of them. All of it sits on clean energy that would otherwise be curtailed or wasted. That's what we mean by renewable computing. It's our mission to make renewable energy a global superpower using computing as a catalyst. Thank you for your time today. Operator, we'll take questions now.

Operator | Conference Operator

We will now begin the question and answer session. Please limit yourself to one question and one follow-up. If you would like to ask a question, please press star 1 to raise your hand. To withdraw your question, press star 1 again. We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster. Your first question comes from the line of Mike Coloness with HC Wainwright & Co. Your line is open.

Please go ahead. Mike Coloness | Analyst, HC Wainwright & Co.

Hi, good afternoon, guys. Congrats on all the great progress across the platform from an education and financing standpoint. First one for me, you announced last month that you signed an LOI with a potential tenant for a copy too. Just curious if you could share more information on how those negotiations are progressing and what needs to take place before a lease can be executed at the campus and what investors could expect from a timing standpoint.

John Belizaire | Chief Executive Officer

I'll start. Thanks, Michael, for turning the call. We get that question a lot, timing of the lease. As you know, these leases are very complex activities. Really detailed negotiations need to take place, and that's all underway. So while we can't speak to timing, what we can say is that we're now executing like an infrastructure, AI infrastructure company. We're building the execution teams, developing our sites, designing the data centers, ordering long-lead equipment, as you've heard, starting pre-construction activities, doing community development, and gearing up capital formation as we negotiate the commercial terms with at least one potential customer. So I'd say the answer to timing is stay tuned, and I'd say that we're making good progress in the process over here.

Mike Coloness | Analyst, HC Wainwright & Co.

Thanks for that, John. And a number of questions we've received from investors around power availability to Energize Saloon as a near-term AI data center development, particularly Kati 2 and Dorothy 3. And I appreciate the comments you shared there, John, around the location adjacent to existing Energize facilities that are powering Bitcoin mining data centers. But how should investors think about, you know, Current Energized Capacity that can theoretically power ACOTI 2, DOROTHY 3, and then really, you know, the incremental megawatts needed to say, let's power the first initial phase for each of those developments, you know, especially as you navigate some of the audit requirements that are going on in ERCOT. I know it's a mouthful, but it's come up quite a bit in our investor conversations.

John Belizaire | Chief Executive Officer

I can imagine that question would come our way. First of all, as I said on the call, we are very supportive of the audit process. Governor Abbott is looking at things the right way. Data centers should be positive additions to the community, to the grid, and should be thinking about how they're going to affect those two elements. and so what we can say is that for the past eight years, Saluna's design has been focused on that very thing, making a positive difference in the community, developing data centers that integrate and service the grid and the fact that they're behind the meter gives us an advantage because we already And that is exciting to us because the governor is sort of implying that that should be the way and it's already the Saluna way. And so to your question, Dorothy 3 will source its power from the grid and the Briscoe Wind Farm. As I said, we now own that asset, and so we can deliver that energy quite easily to the Dorothy 3 project. And the Cottey platform, the Cottey campus that we're building out is drawing power from the Las Majadas Wind Farm. also already energized, as we had commented across the street at the Bitcoin side, allowing us to stay within this concept of energized loads being less of the focus and more of the focus on studied loads. And so we'll be able to source energy from Las Maharas. We have worked with them to increase the amount of energy that we can draw from that power plant. And that's why we're doing additional upgrades to support that new Power Envelope, if you will, to support the campus expansion. The other thing that I mentioned in my portion of the conversation, and Ryan made mention to it in the CODI-2 update, we are also investing in bringing firming energy to the site by drawing from local gas lines that are close to CODI-2, and that will allow us to look at the development of additional generation back there to provide additional prime power to the site. So both campuses have access energy. Both campuses are already energized as part of the previous investments we've made in grid integration. And so we feel we're positioned very well as part of the audit. Everyone's going to get an audit. We welcome it. We already know We will answer those questions, and I think they will be well received by ERCOT and the governor's office.

Mike Coloness | Analyst, HC Wainwright & Co.

Great. Appreciate all the colors there, and thank you for taking my question.

Operator | Conference Operator

Your next question comes from the line of Michael Donovan with Compass Point. Your line is open.

Please go ahead. Michael Donovan | Analyst, Compass Point

Hi. Thanks for taking my question, and also congrats for the progress. You've previously discussed hyperscaler and neocloud interest at CHI2. Can you help us characterize the prospective tenant now under LOI? And then at Dorothy 3, how would you characterize the quality and stage of inbound interest you're seeing?

John Belizaire | Chief Executive Officer

Mike, you want to take that just to share the love?

Michael Picchi | Chief Financial Officer

Thank you, John. Well, with regard to qualifying the CODI-2 interest, we have not specified whether it's a hyperscaler or neocloud. They were under letter of intent. And so we'll leave it at that for today. And then with regard to Dorothy 3, I would say the inbound level of interest is very keen. In fact, I would say it pulled forward our development efforts there as we worked through this year. We've been very focused on CODI-2. and we've talked a lot about Dorothy 3 here in the last quarter those two projects in aggregate 650 megawatts but now you see already us lining up the projects behind that Project Fay and Rosa and the like so the Dorothy 3 customer interest is accelerated our development of the site and uh So we're very excited about that. Having the Briscoe Wind Farm there is a significant asset. It's going to make that a really wonderful campus for us.

John Belizaire | Chief Executive Officer

Yeah, and I would add that the types of customers we're seeing and the types of interests fills the gamut in terms of hyperscale and neocloud.

Michael Donovan | Analyst, Compass Point

Appreciate that, Ant. And Mike, you mentioned going forward developing at Dorothy 3. So just for clarification, are you formally marketing Dorothy 3, or are you still on track for beginning in fall? And if it's beginning of fall, what remaining milestones need to be completed before you launch the formal tenant process?

John Belizaire | Chief Executive Officer

So I'll start there. What we've been doing is following a very specific process we've laid out that says we have to put a master plan together, have begun any kind of interconnection updates and amendments that we need to do to the interconnection process for AI, and land, long lead, all the things that Ryan mentioned before we mark it. But given the level of demand that's happening in the marketplace right now, that doesn't keep people from calling us. And so we have been receiving inbound interest, and we're generally saying, you know, here's sort of some high-level things about the site, and we'll begin formal marketing in the fall. So I'd continue thinking about that timeline, but I also want to share that our phone is ringing.

Michael Donovan | Analyst, Compass Point

That is Dan. Ryan, congrats on joining Saluna. You touched upon long lead items. Generally, how are you thinking about equipment availability and broader supply chain risk as you move toward construction?

Ryan Carver | Chief Development Officer

With respect to equipment availability, we already have a lot of key long lead equipment, electrical equipment on order right now. And that's always something that's a risk in the industry. I mean, every building I've ever built, especially recently, equipment's always in question. So being prepared, pre-ordering equipment as much in advance as possible as we can as an organization. and looking at our campus master plans and looking to quantify how much equipment we need and when we're going to need it so we can be prepared for it. And when it comes to water, right now we're looking at leveraging closed loop systems. For the most part, we're not using direct evaporative right now. So water on site will not be an issue. We do have a couple of other, we do have some wells that are drilled and we've identified aquifers that can serve to add in other common areas right now.

Michael Donovan | Analyst, Compass Point

Great. And then one more, if I may. So obviously this will be really driven by customer interest and and Neve. I was hoping we could get a bit more granular design and build out of data centers. So once a lease is executed, how should we think about the phasing, sizing of individual data center halls and timeline from lease signing to initial RFS?

Ryan Carver | Chief Development Officer

I mean, the sizing of data halls, it's going to really that may differ depending on the client task, right? And I don't want to get into any proprietary details at the moment. We're not prepared to speak to that naturally. What was the second part of your question?

I'm sorry. Michael Donovan | Analyst, Compass Point

How do you think about that? Yeah, so thinking about timelines, getting to initial RFS.

Ryan Carver | Chief Development Officer

So right now we're looking at for – Fricati, too. It's going to be 15 months, roughly 15 months after contract signing.

Michael Donovan | Analyst, Compass Point

Great. Thanks, guys. Again, congrats on progress.

Ryan Carver | Chief Development Officer

Thank you.

Operator | Conference Operator

Your next question comes from the line of Chris Brendler with Rosenblatt Securities. Your line is open.

Please go ahead. Chris Brendler | Analyst, Rosenblatt Securities

Hey, thanks for taking my questions and congrats on all this progress. I'm a bit newer to the story, so Forgive me if this is somewhat of a bigger picture question that may not be appropriate for a conference call, but I'm sort of struck by all the opportunities and all the execution you've had this quarter and then all the opportunities you have ahead. How do you think about allocating capital towards the growth opportunities that you're faced with? And is there any sort of idea of potentially partnering or growing the footprint through and some sort of combination given your relative size to the amount of your pipeline. I'd love to hear how you're thinking about that dynamic.

Thanks. John Belizaire | Chief Executive Officer

Thanks for the question. Thank you so much for having me. We look at essentially stair-stepping the growth of the business, proving one project at a time that we can execute. We'll get access to capital for that initial project and then as we execute and start driving revenue It opens more doors to capital as we are able to execute. We are always looking at both financial partners and execution partners that can help us to scale. That's why in our AI structures we do explore joint ventures that can help accelerate us, give us access to expertise, capital, and other assets that we may not have. and so when we look at the almost 1.6 gigawatts of AI projects that we have underway right now, we are very focused on the first two because that's going to be the proof point that we are in fact an AI infrastructure platform. We are building out a team to allow us to execute around those projects. And once we've done that, we will have access to more and other assets that can help us grow and attack the rest of the pipeline. And so I guess we think of we think of it as being incremental. And through that approach, we believe that will help us to grow and be successful in our strategy.

Chris Brendler | Analyst, Rosenblatt Securities

That's fantastic. Thank you for that color. My follow up question was on Texas and, you know, I thought your answer on the The reasons why you're well positioned given the current situation with Earthquake is pretty, you know, pretty strong and reasons for optimism that you kind of sit at the top of the queue there. You know, does the, like in your experience, does the renewable generation that you bring, you know, sort of help escalate your requests? And is that something that you sort of like, before this all happened, were you expecting to be in and Batch Zero. Do you get any color on that front? I would just think that given your power profile and bringing renewables when there's a lot of concern about making sure we don't impact consumers here and bringing power, especially renewable power is a great way to do that. So I'm just wondering if you have any big thoughts on the intricacies of that process at ERCOT since you had some experience there. Ryan, thanks.

John Belizaire | Chief Executive Officer

That's a great question, Chris. I'll certainly take that. The way to think about it is we have built an incredible amount of process expertise and understanding of the ERCOT market. Thank you so much for having me. and that's the insight that they needed to understand the modeling and what would make things successful by integrating these assets and also how to approach the large load process. We were among we were one of many, but we were one of the first to open the kimono, if you will. What we like about this audit process, it's a continuation of that approach to transparency. We have as a company, a core focus on our technology and our projects really being of service to the grid. As I mentioned, we deploy our data centers with renewable energy to consume wasted and otherwise You know, unused power, which allows the grid to absorb more of that type of power. If you go to every one of our sites, we are a positive addition to the community. We don't use water. We create jobs. We bring our own power, which is this behind the meter integration. and with the AI approach that we're doing, we're going to do more of that. And if you zoom in on what happens to power prices and whatnot in the regions where we're located, because of the structures and the way power flows and the revenues that flow to those communities, Thank you. We feel pretty positive about the fact that because our sites are already energized, we'll be included in the batch process going forward, and we were already submitted as batch load, so it's kind of hard for a grid operator to say, you have power, you're using the power, tomorrow you no longer have that power. That's not the goal of this audit. It's really just to make sure that these projects are are genuine and will be additive to the grid. Now, we can't make any promises. This process has just launched. I think tomorrow is the day that they're going to sort of announce more detail on how it's going to work. But what we expect is we'll receive RFIs that essentially ask us about what are you guys doing back there? How does this affect the community? What's your background? How are you going to build these projects, timelines, budget, all that kind of stuff? and we're prepared to provide that information because we think it's the right thing to do.

Chris Brendler | Analyst, Rosenblatt Securities

That's a fantastic cover.

Thanks so much. Operator | Conference Operator

Your next question comes from the line of John Roy with Water Tower Research. Your line is open.

Please go ahead. John Roy | Analyst, Water Tower Research

Excellent. Thank you so much for taking the question and a great quarter. I wanted to maybe take a step back a little bit and look at it a little bit differently. If you look over the next 18 months, John, what do you see as the single biggest risk to achieving what you guys have laid out?

John Belizaire | Chief Executive Officer

I'll start the answer and I want to turn it over to the rest of my colleagues to provide their perspective. I always love the risk question because we ask ourselves the same question inside the company. What are our biggest risks and how are we going to mitigate it? We are transforming the company into an AI infrastructure company. We weren't one before. So in that transformation, we look at what are the biggest risks and challenges. I think the number one risk and challenge is execution capability. Do we have all of the tools, the architecture, the expertise, the talent, the partnerships, the capital to be successful over the next 18 months? And when I zoom in on that, I think the biggest risk earlier this year was, do we have the people, the expertise that can de-risk our execution and allow us to perform at the highest possible levels? You know how you solve that? You go hire a Ryan Carver. You hire the best of the best and ask him to go build a team. And that's what we've been focusing on over the last quarter is expanding our team with expertise that we now need to to go execute on this incredible asset that we have. I'll pass the baton to Ryan Carver, get his perspective, and I'm sure Mike Picchi has some thoughts.

Ryan Carver | Chief Development Officer

Yeah, thanks, John. I would tend to agree with you that that would be the biggest risk, which you are appropriately articulated. That's something that we're building right now. We're building the team. I do have a very strong background and a lot of experience with hyperscale development at the highest level at Microsoft. And I'm very humbled to have that experience and be able to bring it over here to Celuna. So as John mentioned, we're building a team as far as risk is concerned. Someone already touched on long-lead equipment risk. That is something that we can mitigate though by getting in front of it, as I previously noted. I would say... continuing to build the team. That's our biggest risk and we're mitigating it now.

Michael Picchi | Chief Financial Officer

Thanks, Ryan. You know, I think in terms of the challenge in the data center industry, two big challenges, access to power and access to capital. And I was so attracted to Saluna because of the neat power position. And I just love that tie into that we We're bringing load to power. We're bringing load to the generation assets that already exist. We don't have to get in a line for the utility queue or the grid operator down the road. We're tied into these wind farms and solar farms that already exist. But the second part of that is the risk item I think about raising the capital. And I think the project level attack, plan of attack and raising Project Level Debt, that roughly 80% loan-to-cost ratio is viable and has been proven multiple times in multiple transactions over the last five years as a viable path. And then in terms of on the Saluna side, for the other 20%, coming up with the equity or equity partners or joint venture partners that could help fund the equity piece of it. And so that's what we work on and trying to to have a portfolio approach to how we fund these projects that will allow us to execute on all 1,600 megawatts that are in line of sight right now, inactive. Thanks, John.

John Roy | Analyst, Water Tower Research

Great. Can I get a follow-up real quick to Ryan? I really wanted to understand, Ryan, what really pulled you to Saluna? What really excites you about things going forward?

Ryan Carver | Chief Development Officer

You know, Saluna has a really interesting value proposition to me when it comes to co-locating the data center directly adjacent to sustainable power assets. Something that was very, very interesting to me. As Mike alluded to and John alluded to previously, we already have the power generation assets in some conditions. In some conditions, we own the entire lifecycle from power generation to the data centers that we're going to be developing here very shortly. So there is a unique value prop for, again, co-locating data centers with renewable power generation that would significantly reduce the time. I love to build very, very fast. Safety is always a number one priority. I think that goes without saying when you're in the construction industry. But we can go even faster because the fact that we own our own assets and we can bring the data center right there. And there are a number of different wind farms where we already have pre-existing exclusivity agreements. PPAs are already negotiated. There are a lot of different advantages that we have where Thank you for having me. The environmental impacts, you know, there's a lot of people are going to sustainable carbon zero, net zero by 2030 and things of that nature. We have sustainably, we have traceable, sustainable power that we can prove how much we're consuming, faster time to market, and we own the assets. So those were all very appealing things to me.

John Roy | Analyst, Water Tower Research

Excellent.

Thanks so much. Operator | Conference Operator

We have reached the end of the Q&A session. This concludes today's call. Thank you for attending. jsPDF 3.0.3 D:20261125015957-00'00'

Research summary and source transcript

failedJun 10, 2026

SLNH FY2026 Q1 earnings-call analysis could not be generated from a fetched transcript.

Information Gradient cannot be assessed until a readable transcript is available.

No business-engine assessment can be generated until a readable transcript is available.

  • No management-topic frequency assessment can be generated until a readable transcript is available.
  • No management-excitement assessment can be generated until a readable transcript is available.

No management-tone assessment can be generated until a readable transcript is available.

  • No obvious dodged questions were stored.
  • No explicit goalpost moving was stored.

No competitive-position assessment can be generated until a readable transcript is available.

  • No key figures can be extracted until a readable transcript is available.
  • No explicit catalysts were stored.
  • Analysis failed: NASDAQ: Transcript fetch failed with status 404.

No data center impact can be assessed until a readable transcript is available.

  • Restore transcript ingestion, then reassess management tone, directness in Q&A, guidance quality, and capital allocation.

FY2026 Q1 earnings call transcript

0 chars

This analysis was stored before transcript text persistence was enabled. Re-run earnings-call ingestion for this quarter to store and display the full transcript.

Research summary and source transcript

failedJun 10, 2026

SLNH FY2025 Q4 earnings-call analysis could not be generated from a fetched transcript.

Information Gradient cannot be assessed until a readable transcript is available.

No business-engine assessment can be generated until a readable transcript is available.

  • No management-topic frequency assessment can be generated until a readable transcript is available.
  • No management-excitement assessment can be generated until a readable transcript is available.

No management-tone assessment can be generated until a readable transcript is available.

  • No obvious dodged questions were stored.
  • No explicit goalpost moving was stored.

No competitive-position assessment can be generated until a readable transcript is available.

  • No key figures can be extracted until a readable transcript is available.
  • No explicit catalysts were stored.
  • Analysis failed: NASDAQ: Transcript fetch failed with status 404.

No data center impact can be assessed until a readable transcript is available.

  • Restore transcript ingestion, then reassess management tone, directness in Q&A, guidance quality, and capital allocation.

FY2025 Q4 earnings call transcript

0 chars

This analysis was stored before transcript text persistence was enabled. Re-run earnings-call ingestion for this quarter to store and display the full transcript.