readyNov 25, 2026

DGXX's FY2026 Q3 call is best read as a thesis-quality check, not a transcript recap. The upside case is that AI and compute-heavy infrastructure demand are becoming real drivers of customer activity. The key investor question is whether that activity converts into durable revenue, royalties, margins, and cash flow rather than remaining a strong-sounding demand story.

Framework #1 asks what management may know now that the market may not fully recognize for 6-24 months. For DGXX, the possible information gradient is whether current demand, backlog, customer activity, or AI/data-center engagement is an early signal of durable conversion rather than a one-quarter narrative. The transcript still needs follow-through in future quarters before that can be treated as proven.

The business engine appears to be license/design-win activity that later converts into royalties, with valuation quality depending on renewal rates, backlog conversion, and margin durability.

  • Management centered the story on AI, compute, or data-center demand, which is the key thesis variable to verify in future quarters.
  • Backlog and demand visibility were important to the quarter's credibility.
  • Margin quality remains a follow-up topic because the transcript does not resolve it.
  • Customer renewal and new-logo activity are the clearest checks on whether demand is broadening.
  • Management's strongest emphasis appears to be around demand momentum and AI/compute-related opportunity; the useful investor question is whether that enthusiasm is backed by conversion and customer economics.

The tone reads constructive but still needs investor skepticism. Management appears to have enough operating evidence to discuss momentum, but the call only becomes high-quality if the numbers support conversion, margins, cash flow, and customer breadth. Local fallback reason: model analysis failed during on-demand transcript rendering: Earnings call analyzer failed with status 403..

  • No clear dodged analyst question was detected by the local fallback; manual review should still check whether Q&A answers quantified conversion, margins, and guidance.
  • There may be a benchmark or metric-framing issue worth manual review, especially around adjusted metrics, timelines, or changed expectations.

Competitive position looks potentially improving, but not proven. Customer activity and AI/compute exposure suggest the company may be in the right demand pools; the missing proof is market-share data, pricing power, win/loss detail, and retention economics.

  • Key figure to verify: So, first quarter 2026 highlights, our revenue went up 85% to 12.25 million The second quarter of 2026 and at 50% from the third quarter of 2025 AI revenue of 5.66 million at more than 400% from the second quarter and representing now 46% of total revenue compared with no AI revenue in the third quarter of 2025 GPU rental Vermetal through Neoclad V of 2.46 million, up 127% from the second quarter, compared with no GPU rental revenue in the first quarter of 2025.
  • Key figure to verify: Energy sales through our power plants of 3.29 million, up 68% from the second quarter, and 9% year over year.
  • Key figure to verify: Legacy Bitcoin Activities fell to approximately 27% of revenue from 63% a year ago.
  • Key figure to verify: Positive EBITDA of 6.5 million and positive adjusted EBITDA of 0.6 million compared with 1.7 million and negative 1 million respectively in the third quarter of 2025.
  • Key figure to verify: Positive net income of a million dollars materially supported by digital currency and warrant valuation gains compared with net income of 0.1 million in the third quarter of 2025.
  • The quarter appears to be moving from story to evidence: operating momentum is showing up in revenue, royalties, or backlog rather than only in management narrative.
  • Customer activity looks healthier than a one-quarter spike because the transcript points to both retention/renewal work and new-account activity.
  • AI and data-center exposure look strategically relevant rather than cosmetic, because management ties demand to compute-heavy end markets instead of treating it as a generic buzzword.
  • The transcript gives limited margin evidence, so the quality of revenue still needs corroboration from gross margin, operating leverage, and cash conversion.
  • The main open question is conversion: AI or data-center engagement has to turn into recurring royalties, cash flow, and repeatable design wins before it deserves full credit in valuation.
  • Backlog lowers some demand uncertainty, but investors still need timing, cancellation risk, concentration, and conversion economics before treating it as de-risked revenue.
  • Margin durability remains under-evidenced, which matters because revenue growth without operating leverage can be a weak small-cap signal.
  • There is enough downside language in the transcript to require follow-up on execution, timing, or disclosure quality rather than reading the quarter as fully clean.

The data-center angle appears investable but still needs sizing. The call connects the company to AI or compute-heavy infrastructure demand, which is directionally positive, but the thesis should depend on how much of that activity becomes durable revenue, royalties, and cash conversion rather than on thematic exposure alone.

  • How much of the AI or data-center engagement converts into recurring royalties or repeat revenue within the next four quarters?
  • What portion of backlog is cancellable, delayed, concentrated, or dependent on a small number of customers?
  • Can current margin levels persist as mix, headcount, and product investment change?
  • Did management quantify cash conversion and operating leverage, or only highlight revenue and demand?
  • Are customer wins broad enough to imply share gain rather than a few isolated projects?

FY2026 Q3 earnings call transcript

31,234 chars

NASDAQ:DGXX Q3 2026 Earnings Call Transcript Generated on 11/25/2026 Conference Operator | Operator: Good morning and welcome to the DigiPowerX Inc.'s third quarter 2026 financial results conference call. Please note that this event is being recorded and a transcript will be available on DigiPowerX Inc.'s website. At this time, all participants are in a listen-only mode. A brief question and answer session will follow the formal presentation. Unless noted otherwise, all amounts referred to during this call are denominated in U.S. dollars. Certain comments made during this call may include forward-looking statements or forward-looking information within the meaning of applicable U.S. and Canadian securities laws, including statements regarding the company's 2027 outlook, capital plan, and anticipated financing. Such statements and information reflect current expectations and are, as such, are subject to a variety of risks and uncertainties That could cause actual results to differ materially from current expectations. Those risks and uncertainties include, but are not limited to, factors discussed in DigiPowerX Inc.'s report on Form 10-Q for the three and nine months ended September 30, 2026, and the annual report for the year ended December 31, 2025, as well as the company's other disclosure documents. Except to the extent required by applicable law, DigiPower X undertakes no obligation to publicly update or review any forward-looking statements. During the call, management may make reference to certain non-GAAP financial measures that are not Thank you for joining us today. and made accessible under the company's continuous disclosure profile on CDAR Plus at www.cdarplus.ca and is also available on the FCC's EDGAR website at www.fcc.gov forward slash EDGAR. I'd now like to turn the call over to Michel Amar, CEO of DigiPowerX. Please go ahead, sir.

Michel Amar | Chief Executive Officer

Good morning, everyone. and thank you for joining us today as we share our results for the first quarter of 2026 for DigiPowerX. Our first quarter results show that DigiPowerX transformation into AI infrastructure company is beginning to take hold. So, first quarter 2026 highlights, our revenue went up 85% to 12.25 million The second quarter of 2026 and at 50% from the third quarter of 2025 AI revenue of 5.66 million at more than 400% from the second quarter and representing now 46% of total revenue compared with no AI revenue in the third quarter of 2025 GPU rental Vermetal through Neoclad V of 2.46 million, up 127% from the second quarter, compared with no GPU rental revenue in the first quarter of 2025. Energy sales through our power plants of 3.29 million, up 68% from the second quarter, and 9% year over year. Legacy Bitcoin Activities fell to approximately 27% of revenue from 63% a year ago. AI revenue more than offset that decline. Positive EBITDA of 6.5 million and positive adjusted EBITDA of 0.6 million compared with 1.7 million and negative 1 million respectively in the third quarter of 2025. Positive net income of a million dollars materially supported by digital currency and warrant valuation gains compared with net income of 0.1 million in the third quarter of 2025. Let's talk about the balance sheet and liquidity as of September 30, 2026. Cash and cash equivalents and digital currencies of 119.6 million. Working capital of 103 million compared with 17.5 at September 30, 2025. Digital currency holding of 24.5 million up 56% year-over-year. Net fixed assets of 145.6 million up 646% year-over-year, reflecting infrastructure investment primarily at the Columbiana, Alabama facility. No outstanding borrowing as of today. Balance sheet and liquidity as of today, November 13. The company's cash, cash equivalents, is approximately a little bit above $100 million cash. $168 million year-to-date capital expenditure deployed towards GPU equipment and data center build-out at the Colombiana, Alabama facility. Operational highlights and outlook. Colombiana, Alabama AI campus. Construction of Phase 1 remains unscheduled. We expect to give alternate access to the Phase 1 facility on December 15, 2026. Basically in four and a half weeks from now. And we start conditioning all the liquid cooling and power systems at that time. With Phase 1 billing expected to begin in January 2026. Welcome, Phase 2. I started already for a few months, and subject to various conditions, we are targeting tenant access for Phase 2 in March 2027. We are scheduled to be also on time to give access and a lot of investment has been to work phase two already. Our 10-year tech at-pay collocation agreement with our tenants, Thierry Brasse, our AI collocation that Colombia now expects to provide phase one fees averaging approximately 40 million per year over the 10-year term or approximately $402 million in total. Phase 2 will add approximately $58.5 million in annual fees, bringing combined average annual fees to approximately $107 million per year and a total contract value to approximately $1.07 billion for both phases. The agreement also includes an option to extend the relationship for an additional term which could increase the total potential contract value to approximately 2.5 billion. Neoclub, the token factory, is live. We launched this quarter from Berlin, our token factory, taking DigiPowerX from AI infrastructure provider to direct seller of AI tokens. Running on our own power, data centers and GPUs, the platform sends AI inference straight to customers. The huge advantage of that are the margins. We see margins anywhere from 85% to 90%, actual margins. So it's a business that will create a lot of positive cash flow as we invest in it. Because we own the full stack, we keep a value of every token we serve in terms of renting out compute at wholesale prices. We expect the token factory to unlock a new fast-growing revenue stream with meaningful higher margins, a major step and Major State in turning our infrastructure into full-scale AI business. Let's talk about the $200 million project-level debt financing. As announced on October 13, 2026, we received a commitment letter from a major lending institution for $200 million in debt financing, indicated by Goldman Sachs to support the development of our 40-megawatt AI data center in Columbiana, Alabama, and to strengthen our balance sheet. The financing is expected to be structured at the project's special purpose vehicle level, with an unsecured company guarantee through project completion and other limited matters. The proceeds are intended to support completion of the Colombiana project and related project costs. Closing is currently expected to close in the fourth quarter of 2026, subject to definitive documentation and the satisfaction of various conditions, including the landless completion of the due diligence. 2027 Outlook and Capital Plan We expect to reach an annualized revenue run rate of approximately $250 million to $300 million, or approximately $21 million to $25 million per month by the end of third quarter 2027, subject to adequate financing, market conditions, and various other conditions. Approximately $143 million of that run rate is supported by current operations. and the Colombiana Permanent Agreement. The balance is expected to come from additional AI collocation and GPU capacity currently in development and in customer negotiations.

Conference Operator | Operator

CapEx.

Michel Amar | Chief Executive Officer

We expect 2027 CapEx of approximately $350 million, primarily for approximately 10 gigawatts of AI inference or token factory at 85-90% margins, capacity and the completion of our Phase II Colombiana. We intend to fund this principally through customer deposits and prepayments and contract debt financing, including the proposed $200 million facility together with cash on hand. This approach ties capital deployment to contracting revenue and is designed to minimize shareholder dilution. I want to remind every shareholder that in 2016, I invested from my personal cash $8 million and I never sold one share. And just to tell you that I have a long-term vision of a huge return on my investments. U.S. data centers update. DigiPowerX owns approximately 48% of U.S. data centers Inc., which design and deploys the ARM's modular AI data center system and is developing URP1, a robotic platform for automated deployment and maintenance. USDC is raising capital independently, which will further dilute our ownership interest, without capital contribution from DigiPowerX, without the issuance of DigiPowerX shares. So in order to fund our growth, which is very promising, We're going to raise capital without diluting DigiPowerX or without getting any allocation of DigiPowerX. And I think that's very important for everyone to understand that DigiPowerX today is very focused on power, on GPU diameter, on co-location yield, and cannot afford to allocate extra dollars to expand robotics or modular systems. So that's the reason why we have a different setup to raise capital. What are the opportunities for growth and expansion? We continue to prepare our New York infrastructure assets for conversion to AI, data center operations. and we are targeting the transition of these sites beginning of third and fourth quarter 2027. These sites are powered. One is powered for the last ten years, 18.7 megawatts, and another one where we have a total of 120 megawatts, including our generation of power, for 30 years in terms of generation, and we got an allocation from the utility, which is great because it's all green power, hydro power, and we got an allocation of 63 megawatts there. Because of our financial discipline, we haven't rushed to develop it with the Alabama-Colombiana AI Center in order to control our CapEx. We don't want to rush and be out of cash. So as we transition from a project to execution, which we have been sharing videos of our progress and I was there actually a few days ago and it's really, we are very close to finalize phase one, few weeks. So as we transition from project to execution to live, then we can, you know, keep on going with our assets. In North Carolina, we own Now two sites, about 40 acres adjacent to one of the state's largest electrical switchyards. Our current development plans contemplate two times 75 megawatts, about 150 megawatts, for 2029 and 2030. So that will secure our growth for the future years. Between New York and North Carolina, we can extend to over 400 megawatts worth of capacity, which, depending how we optimize each megawatt, is huge revenues. So we definitely have currently, we own the assets to grow 2x, 3x every year for the next few years. Revenue increased 85% over the previous quarter and AI now accounts for nearly half of our business all before the expected start of Colombiana co-location billing in January 2027. So our priority now is execution, financial discipline, and then we expand our Thank you. Thank you. Deploy capital against attractive returns and fund expansion through customer contribution and contract-backed financing. Our vision is substantial and our discipline is equally clear. Grow recurring revenue and cash generation while minimizing shareholder dilution. Thank you for joining us today. We will now take questions.

Conference Operator | Operator

Thank you. Our first question is, what do Q3 results demonstrate about DigiPowerX's AI transformation?

Michel Amar | Chief Executive Officer

So, it's really an incredible quarter for us. If you think that last year, we were a basically dying Bitcoin company and we had very little cash January 2025. I think a million seven. Very little assets. Net six assets were like 30 million. And in a year, we went from no cash, little assets, a Bitcoin buying business to cash, 120 million dollars, 140 million dollars and made six assets. CAPEX this year already invested of 160 million and AI revenues that represents almost half of our total revenue. So we believe that it was a transformative year and quarter as we are growing accordingly to our pace. We started to process data bare metal rental in May very successfully and a lot of companies came to our site to see our execution and everybody is very impressed.

Thank you. Conference Operator | Operator

How much revenue is reoccurring or contracted?

Michel Amar | Chief Executive Officer

So, Columbia and Alabama provide our strongest long-term contractual revenue visibility with a 10-year take-or-pay agreement. Phase 1 represents approximately $402 million in contractual fees, increasing to approximately $1.07 billion with Phase 2. Neoclad Z and our other operating business also generate ongoing revenue, although contract duration and utilization vary anywhere from two to five years. We are focused on increasing the share supported by long-term commitments. Five years for Neoclad and 10 to 15 years for co-location.

Conference Operator | Operator

Thank you. What does the December 15th Columbiana milestone represent?

Michel Amar | Chief Executive Officer

So December 15th is a key number and considering that we signed the deal with our tenant, Terebras, early May, which is really a few months ago, it's really incredible that we managed to design and finance and set up phase one in basically seven months. I believe we are one of a kind to be able to execute on such a short period of time. And December 15, Turners will have access to the data hall and we will start commissioning The Power and all the liquid cooling systems that are basically down. And it's a very important delivery milestone for us. As a landlord, after the commissioning, we can start billing.

Conference Operator | Operator

Thank you. What is the financial value of the Columbiana Agreement over 10 years?

Michel Amar | Chief Executive Officer

So as stated a few minutes ago, the 15 megawatts first phase represents about $402 million over 10 years, and the second phase of 25 megawatts represents an additional a little bit over $600 million, for a total of $1.07 billion, averaging about $107 million annually.

Conference Operator | Operator

Thank you. Is Phase 2 on track for March 2027 tenant access?

Michel Amar | Chief Executive Officer

So, construction of Phase 2 has already started. There's a lot of common denominators between Phase 1 and Phase 2. The Data Hall has both phases in the Data Hall, so it's there all the fire suppressing requirements all the chillers are already there for both phase, phase 1, phase 2 all the equipment has been purchased for both phase, phase 1, phase 2 so we designed that contract to be able to do two phase so we can financially support it no matter what and we are very advanced in the phase 2 as well So we don't see any issues to be giving access to Phase 2 in March 2027. The commissioning will be easier because all the liquid cooling commissioning will be done this month and early December. So we believe that The time of conditioning will be shorter in March and we expect to deal in April the full total monthly contract.

Conference Operator | Operator

Thank you. What additional value could the renewal options under the Cerebras contract provide?

Michel Amar | Chief Executive Officer

So now it's a little bit under 1.1 billion for the initial term. and we can go to a total of $2.5 billion as an option. And we believe that the investment of a tenant is so huge, they're going to locate in that data hole billions of dollars of equipment, of servers and GPUs, and it's very costly for a tenant to move out. Not only is it costly, it's their economic interest to stay as much as they can as the power shelves are very scarce these days. So the value, in our opinion, will be much greater in 10 years from now.

Conference Operator | Operator

Thank you. Where does the proposed 200 million financing stand?

Michel Amar | Chief Executive Officer

So it's interesting because earlier we had an approved financing that I denied in July from a very big, one of the biggest world institutions, but I didn't like the terms. And then we decided to deny an approved financing to move and syndicate it through Goldman Sachs. And we saved us on this financing about two points, which is incredible. As the interest rate went up, we managed to save two points on the financing. We are pretty close to close the financing. We got the loan documents. So we expect to close in the near future. Definitely in Q4 26, but we are pushing to close earlier. I think we are one of the best candidates for a lender as we invested our own capital, we have cash, and we are executing on time. So we are a pretty good candidate for a lender. But we managed to be Thank you.

Conference Operator | Operator

How will the approximately $350 million 2027 capital plan be funded while minimizing dilutions?

Michel Amar | Chief Executive Officer

So, our funding strategy combines customer deposits and prepayments. So, with the crisis that happened in the last four or five weeks, It was, you know, torture for our stock price, but this is a relaxed company. The entire market went down. It also gave us an opportunity to ask for bigger deposits on new contracts. And now the few discussions that we have, and we are finalizing to set up new contracts. We are getting much more than we used to six months ago. So six months ago, a tenant or a bare metal renter was willing to give you 15%. Now they're willing to give you 30%. And sometimes up to 50%. And sometimes, as we are negotiating now, up to 70%. So then, financing from the customer perspective becomes so easy for us to grow because we achieve something incredible. We are credible. We are not a company that talks about power and may have a connected power with a grid in 28, 29. We are. We are executing. And a lot of very big companies came to our sites. Very large companies came to our sites and understand that we are for real, that we are credible. So now they are willing to support us and give us bigger deposits and help us finance our growth. And that's the major accomplishment that we are realizing by execution.

Conference Operator | Operator

Thank you. What supports the 250 to 300 million annualized revenue target?

Michel Amar | Chief Executive Officer

So we already have about 143 million on the contract and the remaining 107 to 150 million are expected from our development of the other sites through collocation or GPU capacity. And if we had an open bank checkbook, we could have done it for Q1 or Q2, but considering the market condition and our financial discipline, if we want to go fast, we have to work slowly. We have to be careful. So, you know, we survived all the Bitcoin cycle years in 2016. We always survived. And we don't want to be exposed to a financial issue by growing too fast. We have time. There's plenty of market share for us to get. And we believe that Q3 will be in the run rate of what we announced.

Conference Operator | Operator

Thank you. Can operations generate sustained positive cash flow?

Michel Amar | Chief Executive Officer

So, let's talk about Q3. We generated 4.7 million of positive cash flow in Q3. True, with the help of a 12 million Thank you. Thank you. Thank you. Thank you. What drove Neocloud's growth and are its margins sustainable? So, We started with bare-metal GPU rental and you saw the increase of 127% sequentially to 2.46 million as Neoclub descaled. The opportunity of bare-metal and GPU as a service and token factory is to increase Your revenue per megawatt and your margins per megawatt. Considering the environment, the political environment. And by the way, we are very lucky to be in Alabama. I was at the election night last Tuesday with the governor-elect, the coach, Toddy Turpervin. which I have a great relationship and he reiterated directly to me that he's welcoming data centers in Alabama and he's welcoming our contribution, he's welcoming our job creation, he's welcoming the incredible science and technology of AI that will save lives, cure cancer and cure most of incurable diseases. So it's very pro technology and is welcoming, you know, growth in Alabama. So we're very excited because we definitely can expand in Alabama and contribute to the communities and create value to these communities by creating a lot of jobs. Now in our campus, in a very small city, we have about 250 construction workers, highly paid jobs that are going to restaurants, that are going to hotels, that are creating an economic boom locally. So it's really interesting and we're really excited to be in Alabama there. And to go back to this business of maximizing and optimizing per megawatt, considering the scarcity of power and the upcoming regulations of power where they're going to start to basically state-to-state limits powers, you know, below 50 megawatts. They're not going to, I don't think that you're going to see 500 megawatt campus or one gigawatt campus. I think the strategy is more into the 50 megawatts, 25 megawatt campuses, which is very big if you do GPU down at home, very big revenues. Vermetol, today, Vermetol, we can book short-term D300 at $7.75 per hour, Vermetol. If we do tokens, it's $15 to $20 per hour equivalent, you know, per token. So the pricing is booming on the GPU as a service. And it makes sense. because the bottleneck, the struggle, the constraint is permuted available power. And why it creates an opportunity for a small company like ours is that we do own the power, we understand all stacks from power generation to token factory, which is very rare. Not a lot of companies generate power and are able to sell tokens. And every megawatt now, we know how to maximize the revenue and the value. We can get easily two to three million dollars a month per megawatt. So if I just convert 50 MW, that's $100 billion a month. Okay, at very, by the way, very high margins, 85 to 90% margins. So, our catalyst is execution, which we are 95% there, and financial discipline, and we are an incredible company.

Conference Operator | Operator

Thank you. What is the path to securing an AI customer for New York?

Michel Amar | Chief Executive Officer

So, the market is such that there's no, there's so much demand, and there's much more demand today than six months ago. As we shifted from training to insurance, It's exploding. The demand is exploding. We have many potential contracts now that we could sign. And we are being very, very cautious and making sure that we leverage the scarcity of our powered assets. Like New York is permitted and running Deepong Steel, Legacy Business as a data center. It's there. So we just have to shift it to a redundant data center. And we want to make the right deal for the company. We are not in a rush because of the financial discipline. And we want to close our debt financing. And then we're going to develop our New York assets. It's going to be and many more. Thank you. How does the 48% USDC ownership create value for DGXX shareholders? The value and the protection of Digipower Capital. Of course Digipower would want to produce everything, transformers, switch gears, and will be without any capital left for the focus business. So by being a major shareholder, the biggest shareholder of USR Center, that's now planning to produce POTS system, which are very adequate, by the way. The timing is incredible because you're going to see we are getting on the USR Center a lot of action on smaller sites. because that's what's available and that's what is under the radar politically. So a lot of action for us for 27 and 28. It's going to be an incredible company, by the way. And related to this modular system that are housing all the different brands of GPUs, not only NVIDIA, but the B300, the Vera Rubin, the Vera, NL4, NL8, the Cerebra CS4, CS5, the AMD, the Helios, the GD300. We have everything set up and under the US data center, we are also getting deposits from customers to finance the growth along with debt financing in the future. And The slight dilution to get capital does not affect whatsoever DigiPowerX. So now, on Neural Data Center, we are looking to create a nice size value for that company, as we are developing as well robotics, and we actually have industrial robots that will be live This quarter, 2026, and they are going to be related to industrial sites for maintenance, variation of temperature or humidity or, you know, all the different basic data that is needed in the data center. And we're going to start to lead these robots to different industrial sites. So by creating value there, Digipower has a free take on a big piece of the value of the growth of USF Center without any risks that, by the way, cannot afford to take. We don't have a money allocation to go and invest in new ventures. We have to focus on our core business, on the Digipower X, and execute. We have a three to five year plan that take us to a very high level and that's what we should do.

Conference Operator | Operator

Thank you. What milestones should shareholders use to judge execution over the next two quarters?

Michel Amar | Chief Executive Officer

It's very simple. It's purely execution. Phase one, total access in basically five weeks, four to five weeks. Commissioning, starting December 15, or earlier. Dealing, starting January. Closing of a proposed financing in the next few weeks, but in quarter 2026. Progress of a phase two and access in March 27. commissioning and live and dealing in April 27 and adding few AI customers with huge deposits so we don't have to dilute and we can negotiate the best financing, best financing if necessary. So this milestone will show how effectively we are converting our investment into recurring revenue.

Conference Operator | Operator

Thank you. Do you anticipate continued growth in the neocloud sector going forward?

Michel Amar | Chief Executive Officer

So we believe that this is the best use and the best ROI of our investments. because when you work at 85 to 90% margins and you have scarce power connected, this is the best use of your dollars and we don't see any slowdown in the next three to five years. We are actually negotiating contracts now, five-year contracts that are huge and with very little power. So we can execute. So we see a continuous growth in that sector. We just have to make sure we figure out the financing properly.

Conference Operator | Operator

Thank you. Our final question. How do Cerebras 3Q results impact DigiPower?

Michel Amar | Chief Executive Officer

So, you know, A lot of shareholders call me and say, but are you sure about Cerebras? Their stock was $360. It went down to $100. Aren't you worried? How can I be worried about one alternative of NVIDIA? And their results yesterday showed that they are doing great. They are up 55% year over year. Their cloud services revenue, 255%. They have close to $8 billion in cash. And we have an incredible relationship with Cerebus. From management to you, to everyone, they are very, very happy with us. We are very happy with them. We can grow further with them. The only reason that we did not grow out of the same reasons I mentioned earlier, you know, we need to go step by step and be disciplined financially. But as you know, they announced that they have 700 megawatts contracted, and 700 megawatts is hard to find today. They will definitely take more colocation from us, 100%. We just want to make sure that we have a diversified base of customers so we can be more valued. And you have to understand one important factor. In March, when our data center is down, state of the art, by the way, Designed by one of the best designers in the U.S. When our data center is done, our value for liquid cooling data center today is about, in my opinion, $30 to $35 million a megawatt of IT. And I'll tell you how I base my valuation. Blackstone paid, before the election, $27 million a megawatt for a data center in West Virginia. After the election, it's worth easily 20 to 30% more because of the scarcity and potential regulation in Texas and so on. So a Finnish data center alone, the value of it, Excluding the contract value, it's 30 to 35 million dollars on megawatts. Multiply by 40, okay, and you get an idea of what it's worth. Reduct the 200 million dollars debt financing out of a billion two or a billion four, then we have a net equity there of a billion two. That's what it's worth. So, add now the contracted value that brings, you know, monthly EBITDA, recurring revenues, guaranteed, and you add another, you know, $200,000 there. So, we're very confident that our relationship with Cerebras has detonated our credibility. I believe that Cerebras GPUs are very powerful in token per second, TPS, in France. And with all the, you know, travel in NVIDIA, Terebras is very well positioned to grow and take market share, considering NVIDIA has 90% of market share. I wouldn't be surprised if NVIDIA start to go down in market share and Cerebras start to grow in market share. And they're going to need very good partners that they trust. And we are one of them. So we are very excited about our relationship with Cerebras. Any more questions?

Conference Operator | Operator

No. That was our final question.

Michel Amar | Chief Executive Officer

So thank you guys, thank you shareholders for your patience and your support. I know it gets very frustrated to go through the cycles of ups and downs on the stock price, but we are very committed. We have an incredible team. I really want to thank my team, Alec specifically, who is not a big talker, but he does everything A lot of work. He's the one who triggered the Cerebras deal and negotiated the Cerebras deal since last year. And he has a lot of incredible deals on that now that we're going to convert in the short term. And we have a great team in West Coast. We acquired a building. 18,000 square feet in Sunnyvale, very close to Celebras, very close to Super Macro, Google, beautiful building that we are renovating and making beautiful state-of-the-art offices where we're going to have our racks of B300, Vera, and we're going to be able to use it as a showroom and demonstration of our capabilities. We're going to have a small token factory there and we are building an incredible team with Jag and his different engineers. Of course, again, we make sure to grow related to our revenue growth. as a ratio of revenues. But I forgot to mention also, and I'll close the statement, we lower our LGN expenses 30% from Q2 to Q3. So we are trying to be very disciplined in how we allocate dollars. And everybody knows that we have an entrepreneurial approach to business, not a very corporate approach. I let the lawyers be corporate, the accountant be corporate, but as far as speed of execution, we are a very small team that can communicate and execute and make decisions very, very quickly so we can compete. But we have a good shot of getting market share here. Thank you so much, everyone, and let's hope we get a great day today. Thank you, guys.

Conference Operator | Operator

Thank you. This concludes today's conference call. You may disconnect your lines at this time. Thank you for your participation. jsPDF 3.0.3 D:20261125020153-00'00'

Research summary and source transcript

readyNov 25, 2026

DGXX's FY2026 Q2 call is best read as a thesis-quality check, not a transcript recap. The upside case is that AI and compute-heavy infrastructure demand are becoming real drivers of customer activity. The key investor question is whether that activity converts into durable revenue, royalties, margins, and cash flow rather than remaining a strong-sounding demand story.

Framework #1 asks what management may know now that the market may not fully recognize for 6-24 months. For DGXX, the possible information gradient is whether current demand, backlog, customer activity, or AI/data-center engagement is an early signal of durable conversion rather than a one-quarter narrative. The transcript still needs follow-through in future quarters before that can be treated as proven.

The business engine appears to be demand conversion into revenue at acceptable incremental margins; the fallback needs management's KPIs and historical conversion data to grade it more precisely.

  • Management centered the story on AI, compute, or data-center demand, which is the key thesis variable to verify in future quarters.
  • Backlog and demand visibility were important to the quarter's credibility.
  • Margin quality remains a follow-up topic because the transcript does not resolve it.
  • Customer breadth is not yet well proven from the transcript.
  • Management's strongest emphasis appears to be around demand momentum and AI/compute-related opportunity; the useful investor question is whether that enthusiasm is backed by conversion and customer economics.

The tone reads constructive but still needs investor skepticism. Management appears to have enough operating evidence to discuss momentum, but the call only becomes high-quality if the numbers support conversion, margins, cash flow, and customer breadth. Local fallback reason: model analysis failed during on-demand transcript rendering: Earnings call analyzer failed with status 403..

  • No clear dodged analyst question was detected by the local fallback; manual review should still check whether Q&A answers quantified conversion, margins, and guidance.
  • There may be a benchmark or metric-framing issue worth manual review, especially around adjusted metrics, timelines, or changed expectations.

Competitive position looks potentially improving, but not proven. Customer activity and AI/compute exposure suggest the company may be in the right demand pools; the missing proof is market-share data, pricing power, win/loss detail, and retention economics.

  • Key figure to verify: Revenues of 6.6 million, reflecting the planned wind down of legacy operation as the company transitioned to AI, compute and colocation revenue.
  • Key figure to verify: GPU revenue recognized for $1.1 million, representing the company's first GPU bare metal rental initial fleet of B200 and B300 GPUs deployed at the Columbiana, Alabama facility.
  • Key figure to verify: Positive adjusted EBITDA of $3.3 million, an increase of $3.2 million compared to last year, Q2 2025.
  • Key figure to verify: If you add all the depreciation and the non-cash related items, it brings us to a net loss of $14.4 million for the quarter.
  • Key figure to verify: Cash and cash equivalents of $142.4 million versus last year, $1.7 million.
  • The quarter appears to be moving from story to evidence: operating momentum is showing up in revenue, royalties, or backlog rather than only in management narrative.
  • The customer proof is incomplete; investors should look for named wins, renewal detail, and cohort-level expansion before underwriting durability.
  • AI and data-center exposure look strategically relevant rather than cosmetic, because management ties demand to compute-heavy end markets instead of treating it as a generic buzzword.
  • The transcript gives limited margin evidence, so the quality of revenue still needs corroboration from gross margin, operating leverage, and cash conversion.
  • The main open question is conversion: AI or data-center engagement has to turn into recurring royalties, cash flow, and repeatable design wins before it deserves full credit in valuation.
  • Backlog lowers some demand uncertainty, but investors still need timing, cancellation risk, concentration, and conversion economics before treating it as de-risked revenue.
  • Margin durability remains under-evidenced, which matters because revenue growth without operating leverage can be a weak small-cap signal.
  • There is enough downside language in the transcript to require follow-up on execution, timing, or disclosure quality rather than reading the quarter as fully clean.

The data-center angle appears investable but still needs sizing. The call connects the company to AI or compute-heavy infrastructure demand, which is directionally positive, but the thesis should depend on how much of that activity becomes durable revenue, royalties, and cash conversion rather than on thematic exposure alone.

  • How much of the AI or data-center engagement converts into recurring royalties or repeat revenue within the next four quarters?
  • What portion of backlog is cancellable, delayed, concentrated, or dependent on a small number of customers?
  • Can current margin levels persist as mix, headcount, and product investment change?
  • Did management quantify cash conversion and operating leverage, or only highlight revenue and demand?
  • Are customer wins broad enough to imply share gain rather than a few isolated projects?

FY2026 Q2 earnings call transcript

16,794 chars

NASDAQ:DGXX Q2 2026 Earnings Call Transcript Generated on 11/25/2026 Operator | Conference Call Moderator: Good morning and welcome to DigiPowerX Inc.'s second quarter 2026 financial results conference call. Please note that this event is being recorded and a transcript will be available on DigiPowerX Inc.'s website. At this time, all participants are in a listen-only mode. A brief question and answer session will follow the formal presentation. Unless noted otherwise, all amounts referred to during the call are denominated in U.S. dollars. Certain comments made during this call may include forward-looking statements or forward-looking information within the meaning of applicable U.S. and Canadian security laws. Such statements and information reflect current expectations and as such are expected to a variety of risks and uncertainties that could cause actual results to differ materially from current expectations. Those risks and uncertainties include but are not limited to factors discussed in DigiPowerX Inc.'s report on Form 10Q, for the three and six months ended June 30, 2026, and the annual report for the year ended December 31, 2025, as well as the company's other disclosure documents. Except to the extent required by applicable law, DigiPower X undertakes no obligation to publicly update or review any forward-looking statements or information. During the call, management may make reference to certain non-GAAP financial measures that are not separately defined under GAAP, Such as EBITDA and Adjusted EBITDA. Management believes that those non-GAAP measures, when considered in conjunction with GAAP financial measures, provide useful information for both management and investors. Reconciliations between GAAP and non-GAAP measures are presented in the tables accompanying the press release highlighting DigiPower X financial results as of the quarter ended June 30, 2026. Good morning, everyone.

Michel | CEO & Chairman

and thank you for joining us today as we share our results for the second quarter of 2026 for DigiPowerX. I'll start with the highlight of the second quarter, three months ended June 30, 2026. Revenues of 6.6 million, reflecting the planned wind down of legacy operation as the company transitioned to AI, compute and colocation revenue. GPU revenue recognized for $1.1 million, representing the company's first GPU bare metal rental initial fleet of B200 and B300 GPUs deployed at the Columbiana, Alabama facility. And it was started a little bit third week of May to the end of June. It's about five weeks of income. Positive adjusted EBITDA of $3.3 million, an increase of $3.2 million compared to last year, Q2 2025. If you add all the depreciation and the non-cash related items, it brings us to a net loss of $14.4 million for the quarter. Balance sheet and liquidity as of June 30, 2026. Cash and cash equivalents of $142.4 million versus last year, $1.7 million. Working capital of $131 million, representing a $139 year-over-year increase from June 30, 2025. Basically, we had no working capital a year ago. Digital assets holding of $14.3 million. Net fixed assets and equipment deposits for the buildup of the data center in Colombiana, $127.5 million, an increase of 447% year over year, reflecting capitalized investment at the Colombiana Alabama facility.

Unknown Executive | Chief Financial Officer

No long-term debt. Total assets of $279 million versus $37 million a year ago. Balance sheet and liquidity as of today. The company's cash and cash equivalence position is approximately $150 million today.

Michel | CEO & Chairman

Approximately $110 million year-to-date of capital expenditures deployed towards GPU equipment and data center build-out for contract with Cerebras in Alabama facility.

Unknown Executive | Chief Financial Officer

Operational highlights and outlook.

Michel | CEO & Chairman

At the Columbiana Alabama AI campus, The company is still targeting phase 1 ready for service in December of 2026 and phase 2 in end of Q1 2027. Through its GPU as a service and bare metal rental, energy sales and legacy collocation segments, the company anticipates Q3 to increase by approximately over 100% as compared to Q2. Q2 signified a substantial turning point for DigiPowerX as the company recognized its first AI revenues ever along with positive adjusted EBITDA and growth substantially year over year. Our balance sheet remains a source of strength for the company as we hold approximately $150 million in cash and cash equivalent as of today, no long-term debt, and we have already deployed approximately $110 million of CapEx year-to-date into our infrastructure in Columbiana, Alabama. The company is currently in advance debt financing discussions for the Alabama Data Center to advance our path to growth and mitigate dilution. As you know, being the major shareholder since Privately, 2016, where I invested personal funds of about $8 million, I never sold one share and I'm very sensitive about dilution as it affects me primarily. So I am on the same side of most of shareholders. I try to mitigate dilution as much as we can. Considering that last year, 12 months ago, We have basically no cash, $1.7 million. We have basically no assets, $37 million. We have basically no working capital. We had to utilize certain tools like ATM in order to raise cash in order to be eligible for debt financing.

Unknown Executive | Chief Financial Officer

Now I'll be ready for a Q&A.

Operator | Conference Call Moderator

Thank you. We will now be conducting a question and answer session with questions previously asked by shareholders. First question, what are the remaining tasks that DGXX needs to complete before the company can deliver the first 15 MW to Cerebras?

Michel | CEO & Chairman

So basically, we are done with the first 15 megawatts in terms of equipment purchases. All the long-term equipments have been placed and we are starting to receive them this month, actually. We are actually a few weeks earlier than scheduled, so we feel very confident that we will be ready by December for phase one.

Unknown Executive | Chief Financial Officer

Thank you.

Operator | Conference Call Moderator

Second question, a similar question for phase two. What are the major items that need to be complete for delivering the second 25 MW.

Michel | CEO & Chairman

So we also are basically done for phase two. We secured and as mentioned earlier in our total assets, you saw a big portion of deposits for equipment. We already secured all the long-term equipment to the UC November, December. And we believe that we are in good shape to also complete phase two by March 2027.

Operator | Conference Call Moderator

Thank you. Our third question, as it relates to your NEO Clouds business and goal of exiting next year with delivery 10 MW and GPU as a service, What are the obstacles to securing leases for these smaller sized data centers? Is it capital, permits, locating long lead time items?

Michel | CEO & Chairman

So that's a very good, very interesting question. So we have no issue of power and permits in the sense that 10 megawatt is not a lot of power in our power infrastructure. So we do have the power and the allocation. GPU are very, very CapEx intensive. We started to buy GPUs and we are running very successfully, 100% uptime. Really successfully operation for us. And as you know, we placed more GPU orders, the Vera Rubin, that should lend early Q1 next year, and that will add additional income on the GPU Vermetol. Good news in the last few weeks, as you read, NVIDIA and most of the banks, BlackRock, Blackstone, Goldman Sachs, KKL, have created a fund and actually value, residual value for the GPUs. So it's gonna be much easier to get debt financing or asset-based financing on GPUs, which will allow us to accelerate our GPU bare metal program. So we feel comfortable that we get the financing separately from the data center for growth for GPUs.

Operator | Conference Call Moderator

Thank you. Our fourth question, given your sites in North Tonawanda, Buffalo, New York, does the one-year moratorium on data centers in New York impact your ability to meet your targets of exiting 2027, delivering on 10 MW for NeoCloud and 9AN additional 50 MW for co-location data centers for HPC?

Michel | CEO & Chairman

So great, so I get these questions a lot from many shareholders and I want you to appreciate shareholders that we've been running Gitcomb mining legacy operation there since 2016 on one site and since 2021 on another site and we were fully permitted then to run at these two sites on the moratorium law, which was, you know, it's not a new law. It was always there for the last four years or five years. And we are grandfathered in New York. We cannot expand our current footprint of power. So, I think we are using 60 megawatts We are using 18 MW in Buffalo. So we are allowed to use the same power. We are not allowed for now to expand power. But our goal is to just convert another co-location deal of 40 to 50 MW and GP as a service or bare metal for another 8 to 10 megawatts. That's our goal for 2027. So we have plenty of power there to sink our goal.

Operator | Conference Call Moderator

Thank you. Question number five. Please provide an update on the LOI Omni's Pleasance LLC, owner of the Pleasance Power Station, a 1.3 GW power generation facility in West Virginia.

Michel | CEO & Chairman

So great, so the owners of that power plant, one of the owners is AJ Gupta, he's on my board of directors, and we found an LOI, it's a monumental 1.3 gigawatts is huge and I do not want to be involved in the battle there on the power plant side. I just want to get land, access to the electrical infrastructure and utilize utility power of up to 1.3 gigawatts. So I'm working very hard with you know my board member to try to establish a growth path starting with 100 megawatt up to 1.3 gigawatt because the infrastructure is there without being involved in potential liabilities of a power plant. That's why it's a little bit slow and in any event it would be more for a end of 27 to 2030 Operator | Conference Call Moderator: Thank you. Our next question, what is the current strategy for companies' North Carolina property holdings?

Michel | CEO & Chairman

So we own two lands over there, about 40 acres. We acquired within the last 12 months an additional adjacent land so we can properly designed and built an adequate data center there. We are in the process with Youth Energies and the zoning to get all the necessary load studies permits for a major data center. And we believe that we will be able to utilize that asset towards 2029, 2030, with an additional 150 to 200 megawatts of power. So we are trying to plan our growth through all these sites from now till 2030, 31. And if we just, you know, succeed in converting or pivoting in colocation and GPU bare metal, half of these assets Unknown Executive | Chief Financial Officer: We've become a huge, huge, huge company.

Operator | Conference Call Moderator

Thank you. Next question. What is the current strategy for, I'm sorry, what is happening with U.S. Data Centers Inc.? Any updates?

Michel | CEO & Chairman

Yes, so the reason why U.S. Data Center all 48% today from 55% is that we started to raise separately dollars in order to avoid taking the cash that we need 100% on the balance sheets of DigiPower to fuel current data centers and future data centers growth. We cannot be distracted in financing a are basically an equipment business which is your data center purpose to basically design, manufacture modular system, mini data centers prefabricated that you assemble in different sites.

Unknown Executive | Chief Financial Officer

So we did not want to distract or pull any cash Michel | CEO & Chairman: from the DigiPower pool. So we started to raise money on this separately and we raised money up to $125 million pre-revenue valuation. We plan to raise a little bit more on a higher valuation and the plan for 27 is to deliver to different sites, modular systems, like a piece of equipment. So it's a complete different business purpose than DigiPower, which is in the power and data center processing and GPU bare metal.

Operator | Conference Call Moderator

Thank you. And our last question, is the company still using its ATM vehicle? How were the funds utilized? What are your strategies to mitigate shareholder dilution? And also, please provide an update on the company's debt financing discussions.

Unknown Executive | Chief Financial Officer

So that's one of the most important concerns from all shareholders, including myself, the biggest shareholder. Okay, it's sometimes the ATM is a necessary evil.

Michel | CEO & Chairman

And 100% I can assure you that with $1 million last year, $1.7 million last year of cash, I could never take off, borrow, stop any type of AI business, impossible. So I had to position the company in a way where we could be eligible to attract lenders with a strong balance sheet. Of course, everything has to be done in measures, and I think we raised most of our ATM capital early Q2 at an average of, I'm not going to guarantee the average, but much higher of our stock price today. I think our last ATM draw was at $7.25 or $7.50 a share. So we did not draw any dollars below that, if my memory serves right. So now we accumulated enough cash to, A, self-fund most of the data center of Alabama, So we are not at risk of execution from a financial perspective, and I think that it was very important to secure the execution of that first data center, which is the real catalyst force. Then, how can I talk to a lender if I don't have cash sitting on my balance sheet? Lenders want to see cash, strong balance sheets, specifically this year. So now, because we have a strong balance sheet, and I'll talk about the company debt financing discussion today, we ended up engaging Goldman Sachs, a very reputable bank that has proven to be able to syndicate a lot of financing for very big companies. We are very confident that we will lend debt financing for not only this project, which we will get cash back because we already, as we stated earlier, we already capex over $110 million. So we're going to get cash back, we're going to preserve a strong balance sheet, we find a great and other financial partners, not only for this year, but for next year and the next few years of growth, we have all the cards in our hands. A little bit of, you know, faith from our shareholders, the same faith that I give to my company that I invested privately 10 years ago, and we will be Very amazing situation in the next three months to six months.

Unknown Executive | Chief Financial Officer

You have to appreciate that in 12 months, we changed that company numbers dramatically.

Michel | CEO & Chairman

We went from $1.7 million to $150 billion of cash today plus $110 billion of CapEx. That's a huge delta. We went from $37 million of assets to $279 million of assets. You have a company that has real assets with a very, very, in my opinion, low market cap compared to the assets and compared to the cash.

Unknown Executive | Chief Financial Officer

So we are very close to execute our plan.

We execute. Michel | CEO & Chairman

That's our mission. We are focused on the execution. We have all the elements to do so. And next quarter, we should have a great update for you guys.

Operator | Conference Call Moderator

Thank you. And we have reached the end of the question and answer session. And therefore, Michel, do you have any closing remarks?

Michel | CEO & Chairman

I think I just did it. That was my closing remarks. You know, I need to be focused and all the team focus work. I wanted to add that subsequently we are building a very, very small team in Silicon Valley with our CTO Jag. We have very talented engineers building the layer of software for GPU as a service. We got an office that will be open soon, actually very close to Cerebras, NVIDIA, Super Macro. And we plan to offer more, to be all vertical in all the different layers of this business. And the team we are building, some come from, like Jack from Oracle, where he worked for like 11 years there as two gigawatt data centers. So I think we are in good shape. We just need to push, focus. The path is there. It's all about execution. And we are closing the loop on the financial answers to mitigate dilution. It's my goal. It's the goal for every company, but sometimes you have to get to a spot where you're eligible for debt financing. We are there now. Thank you, everyone.

Operator | Conference Call Moderator

Thank you. This concludes today's conference, and you may disconnect your lines at this time. Have a good day. Thank you. jsPDF 3.0.3 D:20261125020154-00'00'

Research summary and source transcript

readyJun 10, 2026

DigiPowerX is executing a strategic pivot from legacy cryptocurrency mining to AI infrastructure, leveraging owned power assets to launch GPU-as-a-service and co-location businesses. The company has achieved positive adjusted EBITDA of $1.1 million in Q1 2026, up from -$1.3 million a year ago, and holds a strong balance sheet with $125 million in cash and $15 million in digital assets as of May 15, 2026. While early AI revenues have begun, the transition remains in its infancy, with most financial upside contingent on future execution of phased data center build-outs and contract scaling.

Management knows today that the company has already begun generating AI revenues from its initial GPU fleet deployment as of the call date (May/June 2026), has secured a 10-year, $1.1 billion expandable contract with a top chip maker (potentially up to $200 billion), and has connected 200-210 MW of power to the grid with plans to reach 393 MW by end of 2028 via owned sites. These specifics — particularly the near-term revenue onset, contract magnitude, and power capacity timeline — are not yet reflected in market expectations, which likely still view the company as a speculative crypto-to-AI transition play without confirmed near-term revenue visibility or contracted backlog.

Owned power capacity (MW), GPU-as-a-service utilization, and long-term co-location contracts underpin revenue generation and scalability.

  • Transition from crypto mining to AI infrastructure
  • Strength of balance sheet and liquidity position
  • Owned power assets and site portfolio (Alabama, Niagara Falls, etc.)
  • GPU-as-a-service (NEO Cloud V) and co-location business models
  • Progress on Colombiana Alabama facility build-out
  • Debt financing strategy to avoid equity dilution
  • Detailed description of the $1.1B expandable chip maker contract and its implications for credibility and future expansion
  • Emphasis on owning substations and power generation enabling 'speed to market' for AI workloads
  • Excitement about delivering first GPU bare metal rental 'as of today' and testing NVIDIA B200/B300 GPUs
  • Repeated references to $125M cash and $15M digital assets as a 'firepower' for execution
  • Optimism about 70/30 loan-to-cash financing enabling growth without dilution

Management speaks with directness and conviction, particularly when discussing the strategic pivot, contract wins, and balance sheet strength. The CEO uses specific timelines, dollar amounts, and technical details (e.g., GPU models, MW capacities) that suggest preparedness and internal clarity. While optimistic, the tone avoids vague futurism and instead anchors excitement in near-term milestones like 'live today' revenue and year-end capacity targets. There is no evident defensiveness or obfuscation; even when discussing past crypto mining, the framing is analytical rather than apologetic.

  • No clear dodged analyst question was detected by the local fallback; manual review should still check whether Q&A answers quantified conversion, margins, and guidance.
  • There may be a benchmark or metric-framing issue worth manual review, especially around adjusted metrics, timelines, or changed expectations.

The company appears to be winning competitively in its niche due to its unique ownership of power generation and interconnection assets, which enables faster deployment and lower energy costs than conventional co-location or cloud providers reliant on third-party utilities. The early GPU-as-a-service revenue and major chip maker contract suggest credible differentiation. However, long-term competitiveness depends on scaling beyond initial contracts and maintaining utilization in a rapidly expanding AI infrastructure market where players like CoreWeave, Lambda, and even hyperscalers are aggressively expanding.

  • Q1 2026 adjusted EBITDA: $1.1 million (vs. -$1.3 million in Q1 2025)
  • Cash and cash equivalents: $71.4 million as of March 31, 2026; ~$125 million as of May 15, 2026
  • Digital asset holdings: $14.6 million as of March 31, 2026 (~208% YoY); ~$15 million as of May 15, 2026
  • Year-to-date CapEx: ~$45 million deployed toward GPU and data center build-out at Colombiana facility
  • Connected power capacity: 200-210 MW live today; target of 393 MW by end of 2028
  • First AI revenues: began 'as of today' (call timeframe) from initial GPU deployment
  • Phase one of Colombiana AI campus ready for service by December 2026, completion Q1 2027
  • NEO Cloud V GPU-as-a-service already live and generating revenue from initial NVIDIA B200/B300 fleet
  • 10-year, $1.1B expandable contract with top chip maker providing predictable revenue and partnership leverage
  • Planned expansion to 393 MW of owned power capacity by end of 2028 via road study completion
  • Ability to finance future data centers via 70/30 loan-to-cash debt structure using strong balance sheet
  • Revenue projections for 2028-2029 ($450B–$1B run rates) are highly speculative and not tied to near-term visibility
  • Dependence on securing debt financing on favorable terms to execute build-out without dilution
  • Unproven ability to scale GPU-as-a-service beyond initial fleets despite early revenue claims
  • Concentration risk in single large contract with chip maker despite claims of expandability
  • Execution risk in co-location business model given lack of detail on tenant acquisition or pricing power

The company has direct and material exposure to AI/data-center demand through its owned power sites and deliberate pivot to GPU-as-a-service and co-location businesses. It is not speculative: management confirms live AI revenues from GPU deployments, a signed contract with a top chip maker, and active build-out of the Colombiana Alabama facility. The strategy is to vertically integrate power ownership with AI compute to capture margin, distinguishing it from traditional co-location or cloud providers. There is no indication of indirect or peripheral exposure — AI infrastructure is the core post-transition business model.

  • What is the actual revenue generated to date from the NEO Cloud V GPU-as-a-service business, and what is the run-rate exit expectation for Q4 2026?
  • What are the specific terms (duration, pricing, renewal options) of the $1.1B expandable chip maker contract, and what portion is fixed vs. variable?
  • What is the detailed CapEx breakdown of the $45 million year-to-date spend, and how much remains to complete phase one of the Colombiana facility?
  • What is the expected timeline and cost to bring the additional 180 MW of power (to reach 393 MW) online, and what permits or studies are pending?
  • How does the company plan to monetize the 200-210 MW of currently connected power beyond the initial GPU contract, and what is the utilization target for co-location vs. GPU-as-a-service?
  • What are the assumed utilization rates and pricing per MW used to derive the $300M–$1B annual run rate projections for 2027–2029?

FY2026 Q1 earnings call transcript

15,269 chars

NASDAQ:DGXX Q1 2026 Earnings Call Transcript Generated on 6/6/2026 Conference Operator | Investor Relations / Call Moderator: Good morning and welcome to DigiPOWER X Inc's first quarter 2026 financial results conference call. Please note that this event is being recorded and a transcript will be available on DigiPOWER X Inc's website. At this time, all participants are on a listen-only mode. A brief question and answer session will follow the formal presentation. Unless otherwise noted, all amounts referred to during the call are denominated in U.S. dollars. Certain comments made during this call may include forward-looking statements or forward-looking information within the meaning of applicable U.S. and Canadian security laws. Such statements and information reflect current expectations and, as such, are subject to a variety of risks and uncertainties that could cause actual results to differ materially from current expectations. Those risks and uncertainties include, but are not limited to, factors discussed in DIGI's Power X inks report on form 10 Q through the three months ended March 31 2026. And the annual report for the year ended December 31 2025, as well as the company's other disclosure documents, except to the extent required by applicable law. Did you power x undertakes no obligation to publicly update or review any forward looking statements for information. During the call, management may make reference to certain non-GAAP financial measures that are not separately defined under GAAP, such as EBITDA and adjusted EBITDA. Management believes that those non-GAAP measures, when considered in conjunction with GAAP financial measures, provide useful information for both management and investors. Reconciliations between GAAP and non-GAAP measures are presented in the table accompanying the press release highlighting DigiPowerX financial results as the quarter ended March 31, 2026, have been filed and made accessible under the company's continuous disclosure profile on CDAR Plus at www.cdarplus.ca and are also available on the SEC's EDGAR website at www.sec.gov slash EDGAR. I would now like to turn the call over to Michelle Lamar, CEO of DigiPowerX. Thank you.

Please go ahead. Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

Good morning, everyone, and thank you for joining us today. Our Q1 2026 results underscore a transformational year in which the company's French-language bank sheet comments the ramping down of its cryptocurrency mining sales as a capital-like infrastructure-scale AI computing platform with a clear path to nine-figure annual revenues. First quarter 2026 financial highlights. Three months ended March 21st, 2026. Positive adjusted EBITDA of $1.1 million from a negative $1.3 million last year Q1 2025. Revenue of $6.8 million reflecting the planned wind-down of legacy operations as the company transitions to AI, compute, and co-location revenues. Balance sheet and liquidity as of March 31st, 2026. Cash and cash equivalents of 71.4 million. Working capital of 67.2 compared to negative 0.8 million at March 31st, 2025. Digital asset holdings of 14.6 million of 208% year over year. Net fixed assets of $26 million have 29% year-over-year reflecting capitalized investment at the Colombiana Alabama facility. No long-term debts. Balance sheet and liquidity as of May 15, 2026. Approximately $125 million in cash and cash equivalents. About $15 million in digital assets. and approximately $45 million in year-to-date capital expenditure deployed towards GPD equipment and data center build-out, principally at the Colombiana Alabama facility. Operational highlights, Colombiana Alabama AI campus. The company is starting phase one ready for service December of 2026, Completion Q1, 2027. NEO Cloud V GPU as a Service. NEO Cloud V, the company's GPU cloud business, will recognize its first revenue in May 2026 from its initial fleet of NVIDIA B200, B300 GPUs deployed at the company's Alabama facility. Closing Message. Q1 2020 seed marks and inflection points for DigiPowerX. Adjusted with data, we've become positive, even as we deliberately run down leadership revenue to make room for a much larger AI compute business. Our balance sheet is the strongest it has ever been. We hold approximately $125 million in cash and $15 million in digital assets as of today. with no long-term debt, and we have already deployed approximately $45 million of CapEx year-to-date into GPUs and infrastructure at Colombiana. That is a firepower to execute phase one on the operational platform that follows. Thank you for joining us today. We will now take questions.

Conference Operator | Investor Relations / Call Moderator

Thank you. We will now discuss some questions we had from shareholders with DigiPowerX CEO, Michelle Amar. For Q1, 2026, can you please discuss the financial results, specifically your cash and cash equivalents, as of March 31, 2026?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

Good morning, everyone. So I stated earlier We ended up with actually $73 million cash March 31st with an adjusted EBITDA of $1.1 million compared to . And the adjusted EBITDA is basically all the non-cash item deducted from the net loss. we actually reflect the DTP capital management and provide us with enough cash to execute on our phase one Colombiana commissioning. It also allows us to leverage our balance sheet to get better debt financing for the future.

Conference Operator | Investor Relations / Call Moderator

Thank you. Do you have any debts?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So as of the zero debt capital structure, as of March 24, 26, as of May 15, we still maintain that zero debt. We are in discussion with different lenders in order to mitigate dilution and leave our the strongest balance sheet we ever had in the history of a company between cash and cash equivalent of $125 million and digital assets that are uncovered of about 15. We basically have $140 million cash, cash equivalent and digital assets that we can leverage to get comfortable financing, best financing, some future data center developments so we don't tap into the equity dilution.

Conference Operator | Investor Relations / Call Moderator

Thank you. Can you discuss the decision the company made in 2025 to strategically pivot and transition from crypto mining to AI data centers?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So that was the greatest decision we made. The decision transition from crypto mining to AI infrastructure, was the most consequential strategic decision in company history. In 2025, two realities had converged. First, the economies of Bitcoin mining had become increasingly compressed and cyclical, while domain for AI and compute infrastructure was entering a generational growth phase driven by frontier model training and inference scaling. But most importantly, we had spent years a portfolio of power-rich sites in Alabama, Niagara Falls, North Carolina, Buffalo, and they were uniquely suited to upscale AI workloads. It took us about 10 years to accumulate these assets that are fully owned by the company and that are very, very valuable today in two forms. one speed to market we don't need to wait for a interconnection with the utility we own the substation we have a utility interconnections we also generate power through our compound cycle gas power plant as we acquire in 2022 and and that allow us to be a very very strong position in terms of speed to market And that's why one of the reasons that we were able to get a major contract from a major frontier AI company and deliver in a basically wake-up time period by the end of this year.

Conference Operator | Investor Relations / Call Moderator

Thank you. How is the company positioned to capture AI infrastructure demand at scale as compared to conventional co-location and cloud competitors?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So we're not a traditional co-operator. We're not an upscale cloud. We believe in the structural advantage of the current AI demand environment. We own and control our power. We have a total footprint of power of about 393 megawatts over four sites. And we have two streams of businesses. One is the Neoclad GP as a service, which, by the way, we are live as of today, which greatly our ability to execute. actually live and getting AI revenues as of today through a contract that we signed and announced a few weeks ago. And this is our first ADDR D200-300GP of the service offering that we intend to scale up. And then we have the co-location strategy, which is basically a modified list where we basically sign a 10-year deal for a billion won that will ensure stability and income without the enormous cap of GPUs. So our business model today is to develop both businesses, co-location, because we do have the power and sizable power, And as a service because we are vertical and we try to optimize every megawatt of power we own and the vertical give us a much bigger revenue stream.

Conference Operator | Investor Relations / Call Moderator

Thank you. How is the company planning to fund its expansion in 2026 and beyond?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So we went through the painful last six months of raising capital, therefore diluting the company. But now that we have basically 125 million of cash and no debt, we can leverage the balance sheet and we are able now to avoid future dilution or mitigate the illusion by financing the growth of our future data centers through debt financing. And having a strong balance sheet helps you to get, you know, better terms in terms of financing. We are seeing about a 70, 30 LTC loan to cash. So instead of going from 100% self-financing, we're going to go to 70, 30% loan-to-cash financing. We already signed a term sheet with a lender in order to grow our business through smart bank financing.

Conference Operator | Investor Relations / Call Moderator

Thank you. How much available capacity does the company have in terms of power MW at its various sites?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So far today, we have connected to the grid about 200 megawatt, 210 megawatt live connected to the grid that we can turn into AI revenues. And we are coming up basically another 180 megawatts where we should get back our road study by 2028, end of 2028. That will give us a total of about 393 megawatts of secure capacity across our site that we own. We also have a that we announced a few months ago with a massive power plant in West Virginia of 1.3 gigawatts that now we are better positioned to explore and come to terms if possible in order to scale up our business exponentially for 2028, 2029, 2030.

Conference Operator | Investor Relations / Call Moderator

Thank you. Can you discuss some of the company's key accomplishments year-to-date, specifically surrounding site expansion, 24-month contract signed with sub-QAI, and current balance sheet and liquidity?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So the year-to-date was an execution achievement. We did the rental agreement a new upcoming lab, and we delivered in a very short period of time, on time. You know, our contract was at the May 15 RSS, and we delivered on time, so we believe it was a very incredible teamwork. We teamed up with, you know, the AVDR team and Supermetro team, and our team in Alabama, and we delivered our first GPU bare metal rental as of today. So that was one major accomplishment. The second, we financially developed a very strong balance sheet that we can leverage for our future, and We do not have any concerns of lack of cash today. We can grow. Third, we signed a massive contract with one of the top chip makers, a world top chip maker of 1.1 billion, expandable to up to 200 billion, and that gives us a steady predictable revenue for the next 10 years and also a lot of credibility as now we are in discussion with many, many top players for expansion in the next few years.

Conference Operator | Investor Relations / Call Moderator

Thank you. When does the company expect to begin generating its first AI revenues?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

Today. We started today, we ended up last night be the first GPU to our customer. And, you know, we're working very hard in the last few weeks. We received the GPUs from NVIDIA first week, first few days of May. And we tested it, commissioned it, and delivered the GPUs to the customer. So we are starting our AI revenues as of today.

Conference Operator | Investor Relations / Call Moderator

Thank you. How many MWs of total live AI infrastructure across the company's multi-site portfolio does it expect to activate in 2026 and 2027?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So we expect to expand our with another few megawatts. Today that first contract that we delivered was a little bit under one megawatt, and we expect to deliver at the end of the year an additional six megawatts. And we get the revenues potentially last quarter of this year or early quarter next year. And we're going to deliver the first quarter, the first phase Collocation contract, December 2026, it's about 15 megawatts, and we'll end up internalizing the second phase, Q1 2027, which would be an additional 25 megawatts for a total of 40 megawatts, which would be a running $8 million, $9 million run rate for the collocation. And it's about, in GPU, it would be about $780 a month, first quarter of 2027.

Conference Operator | Investor Relations / Call Moderator

Thank you. What are the company's revenue projections for the next three years?

Michelle Amar | Chief Executive Officer, DigiPowerX Inc.

So, we won't have an issue with power. We do have the most. one of the most important bottleneck for most of the companies to get access to power. We do have access to power. So our strategy is to turn that power into AI revenues. And our goal is to, for 27, be active with 90 megawatt worth of collocation and basically transfer megawatt of GP as a service. That would give us a total run rate of $300 a year. In 2028, we plan to add an additional 50 megawatt of collocation and 20 megawatt of GP metal. that would give us a $450 to $500 billion year run rate. And in 2029, an additional 100 megawatts of collocation, an additional 50 megawatts of GPU bare metal, that would give us a $800 to $1 billion run rate per year. So this is our goal. It can be accomplished as long as we get the financial strength and the debt financing instruments in place, which we are executing now on the financial side. Our stock is very liquid, so very attractive to the different institutions. So we are getting a lot of interest in funds to partner or lenders to partner with us and support our growth. This is our plan for the next 36 months.

Conference Operator | Investor Relations / Call Moderator

Thank you. That brings us to the end of today's question and answer session. We would like to thank everyone for their participation and interest in today's conference. You may disconnect your lines or walk off the webcast at this time and enjoy the rest of your day. jsPDF 3.0.3 D:20260606090103-00'00'

Research summary and source transcript

failedJun 10, 2026

DGXX FY2025 Q4 earnings-call analysis could not be generated from a fetched transcript.

Information Gradient cannot be assessed until a readable transcript is available.

No business-engine assessment can be generated until a readable transcript is available.

  • No management-topic frequency assessment can be generated until a readable transcript is available.
  • No management-excitement assessment can be generated until a readable transcript is available.

No management-tone assessment can be generated until a readable transcript is available.

  • No obvious dodged questions were stored.
  • No explicit goalpost moving was stored.

No competitive-position assessment can be generated until a readable transcript is available.

  • No key figures can be extracted until a readable transcript is available.
  • No explicit catalysts were stored.
  • Analysis failed: NASDAQ: Transcript fetch failed with status 404.

No data center impact can be assessed until a readable transcript is available.

  • Restore transcript ingestion, then reassess management tone, directness in Q&A, guidance quality, and capital allocation.

FY2025 Q4 earnings call transcript

0 chars

This analysis was stored before transcript text persistence was enabled. Re-run earnings-call ingestion for this quarter to store and display the full transcript.